Site report: CERN

Site report: CERN. Helge Meinhard (at) cern ch HEPiX fall 2004 @ BNL. Events. 50 years of CERN 29 Sep: LHC ring illumination 16 Oct: Open day at CERN: 32’000 visitors 19 Oct: Official ceremony with VIPs CHEP Interlaken 27 Sep – 01 Oct Record-breaking attendance: more than 500

bijan
Télécharger la présentation

Site report: CERN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Site report: CERN Helge Meinhard (at) cern ch HEPiX fall 2004 @ BNL

  2. Events • 50 years of CERN • 29 Sep: LHC ring illumination • 16 Oct: Open day at CERN: 32’000 visitors • 19 Oct: Official ceremony with VIPs • CHEP Interlaken 27 Sep – 01 Oct • Record-breaking attendance: more than 500 • Lot of work… and lot of fun to see it all run well CERN site report – Helge Meinhard - 2

  3. Fabric Infrastructure and Operations (1) • Central Data Recording in full swing • Experiment peaks of 120 MB/s, combined average 10 TB/day, 1.5 PB expected in 2004 • Major problem with disk server stability • Finally whole batch, ie. 1200 disks (~20 % of our total disk count) replaced • Many stateful servers successfully quattorised (J. van Eldik) • Machine room refurbishment going on • LHS of machine room now empty, all machines and services moved to RHS and vault CERN site report – Helge Meinhard - 3

  4. CERN site report – Helge Meinhard - 4

  5. Fabric Infrastructure and Operations (2) • New machines • 400 Farm machines being installed, alleviating pressure on batch farm • Awaiting 75 disk servers (360 TB SATA, 3Ware 9500), plus 22 disk arrays (140 TB SATA, Infortrend, FC attachment) • System administration team taking over more specialised tasks and installations • Legato phased out, new machine for TSM coming CERN site report – Helge Meinhard - 5

  6. Fabric Infrastructure and Operations (3) • Media migration to 9940 completed, evaluations of new tape drives coming • Purchasing for 2006…2008 becoming clearer • Lxbatch field-proving Quattor again and again (T. Kleinwort) • Preparing for LSF 6 CERN site report – Helge Meinhard - 6

  7. Architecture and Data Challenges (1) • Worked with FNAL on SL: SLC3 in final phase of certification • Production-like systems for tests • Support from RedHat started in July • OpenLab • Voltaire joined as contributing partner • Project proposal on security • Disk server studies: 4-way Itanium SIAB (Storage In A Box), 2 x 3Ware 9500, 24 SATA disks: 750 MB/s read, 340 MB/s write, 350 MB/s read over 10GbE (J. Iven) CERN site report – Helge Meinhard - 7

  8. Architecture and Data Challenges (2) • New Castor successfully tested in full chain • OpenAFS: High load on big servers revealed bugs • CERN providing fixes to OpenAFS • Still investigating migration to krb5 • Consolidated HEPiX scripts released CERN site report – Helge Meinhard - 8

  9. Data Bases • Looking at Oracle 10g • Strong collaboration with Oracle (2 Oracle funded fellows in OpenLab) • DataGuard (disaster recovery and scheduled upgrades) • Oracle Streams (replication) • Preparing for a high-availability Oracle cluster (RAC) running under Linux • POOL passed real test with 400 TB of data (D. Duellmann) CERN site report – Helge Meinhard - 9

  10. Product Support (1) • Solaris 9 certification delayed, now targeted for end 2004 • Moving target • Debugging took longer than expected, as did writing NCM components • Solaris will be much more in line with Linux than before • Will use software from Solaris Software Companion • Solaris security • Certification machines compromised three times • Awareness and requirements raised • Considering Ipfilter, AV software, and automatic security updates CERN site report – Helge Meinhard - 10

  11. Product Support (2) • CVS services • 100 projects, 14 GB of source code, 4 new projects/month • Some servers compromised by pserver exploit • Finer control of Web-based access required • Monitoring migrating from UIMON to Lemon (M. Schröder) • Transition to new desktop support contract • New contractor since 01 July • Licensing infrastructure (M. Schröder) CERN site report – Helge Meinhard - 11

  12. User and Document Services • Procedure rolling for new supply contract for CERN desktops • InDiCo (conference management tool) passed field test at CHEP with highest marks • Cern Computer Newsletter changed: • Dedicated pages on computing in every other issue of CERN Courier • More technical and CERN-specific info in online CNL CERN site report – Helge Meinhard - 12

  13. Internet Services • Windows Terminal Server now production service (R. Gaspar) • SMS 2003 client deployed everywhere (R. Otto) • > 100 new servers, Windows 2003 server • Mail • Secure (SSL) services for imap, pop, smtp as an option • Accepting mail requires successful reverse DNS lookup and successful smtp connect • Listbox service renewal (R. Gaspar) • Spam fighting, Exchange 2003 (R. Otto) CERN site report – Helge Meinhard - 13

  14. Security • Many incidents • Sasser worm, cvs breakin, Windows machines taken over by intruders, Solaris problems, lxplus root compromised, … • Lessons: • Tightening firewalls and patch handling • Dual-boot machines are problematic • Non-centrally managed machines are problematic • Visitors’ laptops are very non-centrally managed… • Local Windows admin account forcefully secured by strong password • Viruses arrive at CERN faster than updated signatures • P2P activities often the source of problems CERN site report – Helge Meinhard - 14

  15. Miscellaneous • Grid Deployment moving ahead (I. Bird) • 82 sites, 9000 CPUs in LCG2 • ACB (Automatic Call-Back) on its way out • Call-back and ‘0800’ numbers stopped in July • Final switch-off end 2004 • Pilot for IP telephony • Beam studies for the LHC à la SETI: LHC@home • LCG service challenges (HEPiX Edinburgh) • LCG MoU being prepared CERN site report – Helge Meinhard - 15