An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Episode 3: Concept detailing Episode 3 - CAATS II Final Dissemination Event Episode 3 Brussels, 13 & 14 Oct 2009

  2. Concept Results • Approach for Concept work developed • ATM Process structure, documents with different perspectives • Comprehensive, structured concept documents produced • Detailed concept descriptions produced with new detail for • Network Management Operations • 4D Trajectory Operations • Airport Operations • Lessons Learnt

  3. Concept Documentation • Support implementation of SESAR Target Concept • Production of specifications • Need comprehensive coverage • Sufficient level of detail • Future OSED production • Supporting validation activities • Concept descriptions for exercises DODs Detailed Operational Descriptions ATM Process Model Operational Scenarios Storyboards

  4. Concept Detail Added • Network Management Operations • Military involvement in FUA planning detailed • Need for additional actor identified • Performance criteria formulated for support to CDM processes • Need for tools identified and early proposals for scope of tools • 4D Trajectory Operations • Update and revision process detailed • SBT to RBT agreement detailed • Consistent terminology for planning, ATC and airport operations implemented • Actors roles and responsibilities detailed, MSP actor role refined • Operability of controller role in en route and TMA operations assessed as OK • Airport Operations • Scenarios for airport operations developed (execution and planning) • Airport Operations Plan characterised • Performance criteria formulated for airport management tool • Need for additional actor identified

  5. Concept Lessons Learnt • Concept Authority • Someone needed with the authority (SESAR) to make concept decisions • A Framework is required to structure the concept • Checks for gaps and overlaps • EP3 used the ATM Process Model • Need different document types for different users • DODs, Scenarios, Storyboards, Use Cases