1 / 8

DR KALYAN SEN

Augmentation of Clean Coal from accumulated/fresh slurry of different washeries of BCCL/CCL for metallurgical purposes. DR KALYAN SEN. Director,CFRI. INTRODUCTION. 10-12 million tonnes of coking coal is being washed every year to produce clean coal for steel making.

binta
Télécharger la présentation

DR KALYAN SEN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Augmentation of Clean Coal from accumulated/fresh slurry of different washeries of BCCL/CCL for metallurgical purposes. DR KALYAN SEN Director,CFRI

  2. INTRODUCTION • 10-12 million tonnes of coking coal is being washed every year to produce clean coal for steel making. • 15-20% of coal input is screened out as fines (-0.5 mm). • Hardly 20-25% is recovered by existing slurry treatment circuits.

  3. Constraints • High ash (25 – 35%) • Coal fines contain lot(25-45%) of ultrafines(<45 micron) • Failure of conventional recovery processes.

  4. Scope • More than 4.6 million coal slurry is already accumulated as waste in BCCL area. Equal amount may be impounded in CCL. • In addition to that 0.5 million tonne fresh slurry is produced and impounded every year.

  5. CFRI’S View Utilization of waste slurry for steel making purpose thru froth flotation (patented) techniques, developed and commercialized by CFRI.

  6. Mini Flotation Plant(5-12 tph) • A few mini flotation plants( total 40t/h) are already available to upgrade the accumulated(4.6 M t) and fresh (0.5 Mt/yr) fines • Total capital invested for 40 tph capacity building is around Rs 3 crore. • Possibility of installing additional capacity (say 50tph in 6 months at a cost of Rs 2 crore)

  7. Benefit on accumulated slurry only

  8. OTHER BENFITS • Reduction of import of high quality coking coal to substantial extent, which leads to savings of foreign exchange and energy security • Increasing the qualitative yield of clean coal from the existing washeries • Utilization of waste and effluents. • Pollution free environment • Encouragement of National Award Winning Process in core sector…

More Related