1 / 15

EUR PBN TF

EUR PBN TF. PBN ICAO HQ Activities O verview. PBN - Where are we now?. Current PBN concept Globally harmonized navigation specification based on existing national or regional requirement

bjeff
Télécharger la présentation

EUR PBN TF

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EUR PBN TF PBN ICAO HQ Activities Overview

  2. PBN - Where are we now? • Current PBN concept • Globally harmonized navigation specification based on existing national or regional requirement • Objective: facilitation of standardization with the aim to reduce cost, confusion and accelerate implementation

  3. PBN - Where are we now? • Updated PBN Manual (Advance copy): • 1st week of July 2012 New Edition • PBN concept developments • Builds on existing requirements • Adds new specifications to address operational requirements • Curtails the proliferation of number of navigation specifications

  4. PBN - Where are we now? • Updated PBN Manual - highlights • RNP 2 • High continuity (typically oceanic/remote applications) • Low continuity (typically continental applications) • RNP 0.3 • Intended for slow moving aircraft • Radius-to-fix (RF) (terminal and approach) • Fixed Radius Transitions (FRT) (en-route) • Advanced RNP (umbrella navigation specification) • High level ops approval guidance • Improved implementation process description

  5. Advanced RNP A-RNP + options A-RNP Continental en-route: RNP 2,1 Final approach: RNP 0.3 RF legs Parallel offset RNAV holding RNP APCH RNAV 10 RNAV 5 RNAV 1 RNP 1 RNAV 2 RNP 4

  6. Just Published Flight Validation

  7. Validation Process

  8. ATM / Airspace Planning and Design Support • Continuous Climb Operations (CCO) Manual • Advance copy by July 2012 • PBN Airspace Concepts Manual • Advance copy by July 2012 • ilearn information/workshop package on PBN airspace design • August 2012

  9. Flight Operations Support • PBN Operations Approval Manual • Under review by PBN Operations Approval Tiger Team • Advance copy by September 2012 • ilearn information/workshop package on PBN Operations Approval • September 2012

  10. PBN General • PBN Manual next edition • Advance copy July 2012 • ilearninformation/workshop package on PBN overview • September 2012 • Online PBN implementation status tool • September 2012

  11. PBN General • PBN Implementation toolkit addressing: • Executives • Regulators • ANSPs • Aircraft operators • Manufacturers • September 2012

  12. PBN General Instrument Flight Procedures (a summary) • Criteria to support new edition of PBN Manual • Improved Baro-VNAV criteria • Helicopter criteria • Sample charts • State Letter after IFPP/11 (December 2012)

  13. PBN General (Planning) Planning • ilearninformation/workshop/training package on PBN for other domains • ATC • Pilots • Flight validation • Endorsement programme for service providers

  14. PBN General (Planning) Planning • Collision Risk Model for PBN obstacle clearance and air-to-air separation • Combined effort IFPP and SASP • PBN Procedure Design Safety Assessment Manual • Advanced RNP support document

  15. Objectives • New PBN documentation information • Status of global implementation • Identify implementation issues and problems • Development of a global action plan to support implementation • Plan to be presented to ANC/12 • Register at www.icao.int/meetings/pbn-symposium

More Related