An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Brent terrace residents forthcoming on-site activities update 07.02.19 BRENT CROSS SOUTH Susie Wilson / Benoit Dufour

  2. Introduction Objectives To provide an update to Brent Terrace residents on on-going and forthcoming on-site activities within the Claremont Industrial Estate undertaken on behalf of LBB: • Claremont Industrial Estate site security • Existing Building and environmental surveys • Clearance of Claremont Industrial Estate • Utility disconnections • Rosa Freedman and industrial units demolition works • Considerate Constructors Scheme (CCS) BRENT CROSS SOUTH

  3. Site security Two areas to be secured Post Vacant Possession/Pre-demolition works: • Area 1 (Red) = Rosa Freedman • Area 2 (Green) = Industrial Estate Reasons: • Mitigating risk of squatting / fly tipping • Meter Removals / Utility disconnections • Building surveys • Additional ground investigations BRENT CROSS SOUTH

  4. Site security • Current Works – Securing Rosa Freedman Centre and Industrial Estate BRENT CROSS SOUTH

  5. Site security • Current Works – Securing Rosa Freedman Centre and Industrial Estate BRENT CROSS SOUTH

  6. Site security • Current Works – Securing Rosa Freedman Centre and Industrial Estate BRENT CROSS SOUTH

  7. Demolition works BRENT CROSS SOUTH

  8. Considerate constructors scheme (ccs) Infrastructure Contractor Selection • Appointment of contractor in progress • To be formally announced later in 2019 • Contractor willing to engage with local residents Preferred contractor ensures all sites are registered prior to works commencing – key selection criteria from BXSLP Multiple Gold awards won for their performance under CCS Scheme BRENT CROSS SOUTH

  9. Considerate constructors scheme (ccs) CCS Scheme covers: General Public • Reduce any negative impact on local areas and residents • Aim to leave a positive impression on those affected Environment • Reducing negative effect • Working in environmentally and sustainable manner • Impacts to be evaluated and mitigations implemented to minimise pollution • Reduce / re-use / recycle waste • Materials from sustainable sources Workforce • Provide clean and appropriate facilities for workers • Facilities to be comparable to any other working environment BRENT CROSS SOUTH

  10. Thank you. Any Questions? BRENT CROSS SOUTH