An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OPS ECDA Workshop David Berger & Alan Eastman KeySpan Corporation Pacific Gas & Electric Houston, TX November 4, 2003

  2. KeySpan Gas TransmissionSystem Summary Distance (miles) Less than 20% 20 to 30% Greater than Totals SMYS OPS ECDA Public Meeting

  3. PG&E Gas TransmissionSystem Summary Distance (miles) Class 1 Class 2 Class 3 Class 4 OPS ECDA Public Meeting

  4. IMP Tools • Pressure Test • In Line Inspection (a.k.a. Pigging) • Direct Assessment (a.k.a. DA) • Other OPS ECDA Public Meeting

  5. ECDA Process OPS ECDA Public Meeting

  6. ECDA Steps • Step 1 - Pre Assessment - Dave Berger • Step 2 - Indirect Examination - D. Berger • Step3 - Direct Examination - Alan Eastman • Step 4 - Post Assessment - A. Eastman OPS ECDA Public Meeting

  7. ECDA Step 1 - Pre Assessment • Determine what you know about the main in Question • Determine what threats are being encountered OPS ECDA Public Meeting

  8. ECDA Step 1 - Pre Assessment • Determine the Relative Risk of this Segment • Run Risk Model if Available OPS ECDA Public Meeting

  9. Feasibility Analysis Report Step 1 Pre-Assessment Is the ECDA process technically, practically and economically feasible ? OPS ECDA Public Meeting

  10. IIT Selection Tool Form OPS ECDA Public Meeting

  11. Region Assignment Form OPS ECDA Public Meeting

  12. ECDA Step 2 - Indirect Examination • Tool Selection based on Pipe and Threats • Integrate Pre-Assessment information into Indirect Exam Process • Pipe Region • Tool Types • Expected Results • Data Collection OPS ECDA Public Meeting

  13. Step 2 – Indirect Examinations • Other Logistical Issues: • Home owner notification • CIS through asphalt • City permits Dear Landowner, Recently we sent you a letter notifying you that we would be performing some testing of the natural gas pipeline on your property. As a reminder, the testing will not cause an interruption of your gas service. We are planning to be testing the pipeline in your area next week. If we need to gain access to your backyard, we will contact you in person at the time of the testing. In the event that nobody is home, we will plan to come back and test your property at some future date, most probably on a Saturday. However, please contact our testing Contractor, Mears, at 925-820-7630 if it is acceptable for us to enter your backyard and perform the testing in your absence. The testing will only take approximately 5 minutes per residence. Thanks for your cooperation. PG&E OPS ECDA Public Meeting

  14. 25’ Interval OPS ECDA Public Meeting

  15. 5’ Interval OPS ECDA Public Meeting

  16. ECDA Step 2 • Tool Selection based on Pipe and Threats • Major Threats to LDC’s are Corrosion and Third Party Damage • External Corrosion • Internal Corrosion (Dependent on gas quality) • SCC Not a Problem • First and Second party Damage also an issue OPS ECDA Public Meeting

  17. ECDA Step 2 • Integrate Pre-Assessment information into Indirect Examination Process • Check for CP History • Coating Type and Recent Examinations • Tool Environment • Special Situations OPS ECDA Public Meeting

  18. ECDA Step 2 • Pipe Region • Tool Changes Requires Region Change • Soil Type and Corrosion History May Change Region • Coating Type May Change Region • Pipe Type May Change Region • Pipe Diameter May Not Change Region • Threat Change Requires Region Change OPS ECDA Public Meeting

  19. ECDA Step 2 • Tool Types • CIS: DC Electrical • PCM: Near DC but AC • DCVG: DC Gradient • ACVG: Near DC but AC • Soil Resistivity: Corrosion Rates • Bacterial: MIC Presence • C scan: AC Electrical OPS ECDA Public Meeting

  20. ECDA Step 2 • Expected Results • Based On Threats, What do You Expect to Find • For Corrosion • Coating Damage, Disbondment, Shielding • In Areas with Poor CP, External Corrosion • With Wet Gas, Internal Corrosion • Near Dumps, MIC • Third Party Damage • Coating Damage (Maybe Pipe Damage) OPS ECDA Public Meeting

  21. ECDA Step 2 • Data Collection • Manual or Automatic • Data Storage • Data Retrieval • Data Displays OPS ECDA Public Meeting

  22. GM 33 OPS ECDA Public Meeting

  23. GM 33 OPS ECDA Public Meeting

  24. GM 33 OPS ECDA Public Meeting

  25. GM 33 OPS ECDA Public Meeting

  26. GM 33 OPS ECDA Public Meeting

  27. Part 2 Now Alan will take you through the next two steps

  28. Indirect Inspection Classification(example) CIS Severe……All of the following must exist: • ·Less than 600 mv off • ·200 mv depression over baseline • ·Convergence of on/off potential • ·Other condition that the PE wants to document • ·<500 off (any case) CIS Moderate…...All of the following must exist: • ·Less than 600 mv off • ·200 mv depression over baseline • ·Other condition that the PE wants to document CIS Minor……Any of the following can exist: • ·Between 600 to 850 mv off • ·Other conditions that the PE wants to document OPS ECDA Public Meeting

  29. Prioritization Criteria I = Immediate S = Scheduled M = Monitored NI = No Indication OPS ECDA Public Meeting

  30. CGT Scope • 2192 miles to assess 1673 miles of “covered” transmission lines • 1,273 miles of ECDA ($35,177,000) • 394 miles assessed during 913 miles of ILI ($98,500,000) • 6.5 miles of Pipeline Replacement ($6,500,000) 2004 Scope • ECDA – 117 miles ($5.8 million) • ILI – 79 miles ($12 million) • CIS – ($400,000) • Pipe Replacement – ($2,000,000) OPS ECDA Public Meeting

  31. All pipeline companies will allocate the appropriate resources to ensure the integrity pipelines with the highest consequences of failure OPS ECDA Public Meeting

  32. Step 3 – Direct Examination • Number of excavations per RP0502 • All immediate indications must be excavated (may be re-prioritized after a portion is excavated) • At least 1 scheduled dig per region • Effectiveness digs • First ECDA digs OPS ECDA Public Meeting

  33. Direct Examination • Inspections • Remaining Strength Assessment • Root Cause Analysis • Reprioritization OPS ECDA Public Meeting

  34. Recategorization Work In Progress OPS ECDA Public Meeting

  35. Post Assessment • Remaining Life Calculations • Re-Assessment Intervals • ECDA Effectiveness Validation • Documentation OPS ECDA Public Meeting

  36. Lessons Learned • Establishment of ECDA procedure has been a corner stone of program • Permit Applications time consuming and challenging • Landowner Notifications time consuming • Establishing GIS procedure is critical • IIT methods work • IIT results has aligned well and is rational • ECDA process appears to be working well We are sure there are more lessons to be learned!! OPS ECDA Public Meeting

  37. Example of an ECDA Line 132 Through Silicon Valley Selection Criteria • Identified by Risk Management Program • Primary Threat – EC • Not piggable • 8 OD changes • 10 plug valves OPS ECDA Public Meeting

  38. L-132 Near Major Theme Park • 20 mile section in study area • 24-34 inch, 400# MAOP, 20 to 40% SMYS, 1944 HAA, 1974 Tape • 13 Integrity Management Areas (IMAs) • 6300’ under streets, • 6000’ under concrete, • 4950’ under soil, • 2300’ in paved parking, • 2150’ in backyards OPS ECDA Public Meeting

  39. Results of Classification • Good alignment between techniques • CP was protecting poorly coated section of pipe • Results appear rational OPS ECDA Public Meeting

  40. Results of Prioritization Total of 10 Excavations OPS ECDA Public Meeting

  41. Example of Line 132 Excavation Data Data Element Dig 1 Dig 2 ECDA Region 132-1 132-2 Coating Type Wrap HAA Pipe-to-Soil (-mV) 1051 971 Soil Resistivity 684 684 Coating Condition Partially Disbonded Partially Disbonded Liquid underneath coating Yes Yes Soil pH 5.5 6.0 Pipe pH 7.4 8.0 Corrosion No Yes Pit Depth (inches) 0.015 to 0.031 OPS ECDA Public Meeting

  42. Final Outcome • 500 feet of recoating • 1650 feet of pipe replacement • Remaining indications reprioritized • Re-assessment interval being determined OPS ECDA Public Meeting

  43. Site Three Poor Condition Excavate 10 ft. Excavated, removed coating, sandblasted

  44. OPS ECDA Public Meeting

  45. ECDA The End (I Thought They would Never Finish) OPS ECDA Public Meeting