An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Renewable Energy Project at the Alton landfill site in Richards bay. By Ener·G Systems uMhlathuze (PTY) LTD

  2. Mission statement At ENER·G Systems we deliver clean, sustainable and energy efficient technologies. We lead the way in developing and implementing these technologies for the public and private sector in the market place. We enable our clients to implement environmentally sound projects that deliver both operational and financial benefits.

  3. Landfill Gas

  4. Why Bother utilizing Landfill Gas? • Methane from waste is the largest source of atmospheric methane in the SA. • Methane venting to the atmosphere is 21 times more damaging to the ozone than the emissions of CO2 from an engine. • Methane is a valuable fuel source • Control of methane helps to reduce odours for those people living in and around the vicinity of a landfill site.

  5. Using Landfill Gas

  6. Installation of pipe workmanifold arrangement

  7. Ener·G Systems (PTY) LTD300KW to 1150KW Generators

  8. Pumping Trial

  9. BHP Biliton End User.

  10. Construction Started September 2009

  11. Generator Arrives in November 2009

  12. Alton Flare

  13. Site Complete

  14. Site Complete