1 / 9

USDA/AMS Inspection Results

USDA/AMS Inspection Results. Research and Development Associates Spring 2011Meeting Naples, Florida May 23 – 24, 2011 Michael Lynch Defense Contract Inspection Section PPB, FV, AMS, USDA. USDA/AMS Inspection Results. MRE Retort Pouches Polymeric Trays Component Items.

bree
Télécharger la présentation

USDA/AMS Inspection Results

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. USDA/AMS Inspection Results Research and Development Associates Spring 2011Meeting Naples, Florida May 23 – 24, 2011 Michael Lynch Defense Contract Inspection Section PPB, FV, AMS, USDA

  2. USDA/AMS Inspection Results • MRE Retort Pouches • Polymeric Trays • Component Items

  3. * Lots Failing 1st USDA inspection per USDA Operational Rations Database as of 03/31/2011

  4. * Lots Failing 1st USDA inspection per USDA Operational Rations Database as of 03/31/2011

  5. * Lots Failing 1st USDA inspection per USDA Operational Rations Database as of 03/31/2011

  6. * 9.5% Lots Failing 1st USDA inspection per USDA Operational Rations Database

  7. * 6.1% Lots Failing 1st USDA inspection per USDA Operational Rations Database

  8. USDA/AMS Inspection Results Component Items Individual and Group Rations • 1.7% Average Failure Rate • 1.8% Average Failure Rate Contractors range of failures: 0.0 to 7.7%

  9. USDA/AMS Inspection Results Questions? (202) 720-5021 MichaelE.Lynch@ams.usda.gov

More Related