An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 9: Layout Strategies BUSI 2016

  2. Why is layout strategic issue?

  3. Why is layout a strategic issue? • Get a high utilization of space, equipment and people • Improved “flow” of information, materials and people • Improved employee morale, safer working conditions • Improved customer/client interaction • Flexibility (ie changeability)

  4. Types of Layout

  5. Office Layout • Goal is to optimize flow of information, rather than goods and services. • Issues • Unique factors – pertaining to individual company • (next page) • Universal factors – apply to most offices • Proximity, privacy, permission

  6. Office Layout – Office Relationship Chart

  7. Retail Layout Assumes that sales and profits vary directly with customer exposure to products Five Ideas used in retail • Locate the high draw items on the periphery of the store • Prominent locations for high impulse, high margin items • Disperse “power items” – items that dominate a shopping trip • End aisle locations have a high exposure rate • Put “lead-off” departments in a prominent place

  8. Retail Layout - Servicescapes • Areas in which services take place • Important factors • Ambient conditions (lighting, sound, music, smell) • Spatial layout (plan customer paths, angles for shelves, etc) • Signs, symbols, artifacts (carpet encourages slower traffic)

  9. Warehouse and Storage Layouts • Minimize cost by addressing tradeoffs • Maximize total utilization • Incoming transport • Storage • Outgoing transport • Minimize cost • Equipment - People • Material - Supervision • Insurance - Depreciation

  10. Warehouse and Storage Layouts - Retrieval • Cross-docking • Processing materials as they are received • Random Stocking • Material put anywhere in the warehouse, as opposed to stacking it all in the same place • Accurate records via Automatic Identification Systems needed • Find • Open Locations • Exact items • Travel Time • High-usage / low-usage items assigned based on traffic • Customizing – do “some” work in the warehouse

  11. Fixed Position Layout • Product remains in one place • Ie shipyard, cars pre Henry Ford, operating table • Problems • Limited Space, different materials at different times, different processes • Solutions • Manufacture assemblies off site • Manufacture based on similar designs

  12. Process Oriented Layout • Deals with low-volume, high-variety production. Very flexible • Eg hospital, custom machines

  13. Process Oriented Layout - Optimizing • Place departments with larger material flows closer to each other

  14. Work Cells • Arrangement of machines focused on making one product or family of products (highly standardized) • Advantages • Reduced WIP – set up to provide flow from machine to machine • Less floor space rqd – closer machines to accommodate flow • Reduced raw material and finished goods – rapid • Reduced direct labour – improved communication, better material flow • High sense of employee participation • High machine utilization

  15. Work Cells - Layout

  16. Work Cells – Staffing and Balancing • Determine Staffing • Takt time – how often does a product need to off the line, “beat”, “measure” • Takt time = total work time available / units required • Workers required = total operation time required / takt time • Focused Work Center • “factory within a factory”

  17. Product Oriented Layout • Organized around high volume, low-variety products. • Repetition, continuous • Assumes that • Volume is high enough Demand is stable • Product is standardized (more or less) Raw materials are uniform • Advantages • Low variable cost per unit Low material handling costs • Reduced WIP Easier training • Rapid throughput • Disadvantages • Any work stoppage can tie up entire organization! • Flexibility a challenge

  18. Product Oriented Layout – Assembly line Balancing • To reduce the amount of slack time throughout the assembly process • Balancing resources

  19. Product Oriented Layout – Determining Efficiency • Cycle time = production time per day / units required per day • Min num of workstations = (sum of all tasks)/cycle time • Efficiency = (sum of task times) / (actual number of workstations) * (largest assigned cycle time)