1 / 17

Update on Global Alignment Steven Blusk Syracuse University

Update on Global Alignment Steven Blusk Syracuse University. Preface. The LHCb detector alignment will require several steps. A sensible scenario is: Internal Alignment of the VELO (first halves, then to each other) Internal alignment of T-Stations (IT, OT and IT-to-OT)

Télécharger la présentation

Update on Global Alignment Steven Blusk Syracuse University

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on GlobalAlignmentSteven BluskSyracuse University

  2. Preface • The LHCb detector alignment will require several steps. A sensiblescenario is: • Internal Alignment of the VELO (first halves, then to each other) • Internal alignment of T-Stations (IT, OT and IT-to-OT) • Relative alignment of VELO to T-Stations • Alignment of TT to VELO-T Station system • Alignment of ECAL & HCAL to tracking system • Alignment of MUON to tracking system • Alignment of RICH to tracking system The internal alignment tasks are being addressed by various groups. Here, I present a plan and details for Step 3. Simulations consistent of 5000 event samples of min bias usingGauss v22r1, Boole v10r3, Brunel v28r2

  3. Relative VELO-to-T-Station Alignment • After internal alignment of each, there are in principle 9 global transformations between the two systems: • 3 translations (X,Y,Z) • 3 rotations (a,b,g) • 3 scale factors (Xscale, Yscale, Zscale ) • In practice, Xscale, Yscale are highly constrained by the interwire/strip spacing. Therefore there are realistically 7 global parameters between the two systems. • Align the VELO to the T-Stations by matching segments at the center of the magnet (Zmag).. Pattern recognition done independently in each system. • They can all be measured using MAGNET OFF data: • DX: Mean of XVELO-XT at Zmag. • DY: Mean of YVELO-YT at Zmag. • DZ: Mean of (XVELO-XT)/tanqXVELO at Zmag. • Da: Mean of tanqYVELO-tanqYT. • Db: Mean of tanqXVELO-tanqXT • Dg: Mean difference in azimuthal angle fVELO-fT at Zmag. • Zscale: Mean of (tanqXVELO-tanqXT) / tanqXVELO

  4. Method Details • We use a single kick approximation to the field, where the kickoccurs at the effective center of the magnet (Zmag). • This is only an approximation, and in general Zmag is a function of the track’s X,Y slopes and momentum. • To minimize dependence, we can require high momentum, low angle trackssince we are only seeking global alignment parameters. We require: • p > 20 GeV/c (no p cut for B=0, for the moment) • VELO angles < 100 mrad • TX-seed angle < 200 mrad (Ty–seed constrained since Py ~unchanged) • Zmag is determined using simulation, with “perfect geometry” and field045.cdf. We map out using the straight line intersection of T-seed and VELO tracks: • Zmag = 526.7 cm, and has a mild dependence on X angle. • We correct for it, but it’s not critical to determine global offsets. • Correction to Y-slope in T-Station for change in Pz.

  5. Results with Perfect Geometry: B=0 No Zmag,since nobending DSlopeY Zmag All meansare consistentwith zero ! DX at Zmag DY at Zmag DZ Dg at Zmag

  6. 1 mm X Shift of VELO: B=0 No Zmag,since nobending DSlopeY Zmag <DX>=(942±31) mm DX at Zmag DY at Zmag All other meansconsistentwith zero ! DZ Dg at Zmag

  7. 5 mm Y Shift of VELO: B=0 DSlopeY Zmag <DY>=(4981±55) mm DX at Zmag DY at Zmag All other meansconsistentwith zero ! DZ Dg at Zmag

  8. 1 cm Z Shift of VELO: B=0 All other meansconsistentwith zero ! DSlopeY Zmag DX at Zmag DY at Zmag <DZ>=(1.25±0.12) cm DZ Dg at Zmag

  9. 2 mrad Z-RotationVELO: B=0 All other meansconsistentwith zero ! DSlopeY Zmag DX at Zmag DY at Zmag <Dg>=(2.03±0.16) mrad DZ Dg at Zmag

  10. Results with Perfect Geometry: B=Nom DSlopeY Zmag DX at Zmag DY at Zmag <Dg>=(0.47±0.31) mrad All meansconsistentwith zero ! DZ Dg at Zmag

  11. 1 mm X Shift of VELO: B=Nom DSlopeY Zmag <DX>=(1036±23)mm DX at Zmag DY at Zmag All other meansconsistentwith zero ! DZ Dg at Zmag

  12. 5 mm Y Shift of VELO: B=Nom DSlopeY Zmag <DY>=(5049±71) mm DX at Zmag DY at Zmag All other meansconsistentwith zero ! DZ Dg at Zmag

  13. 1 cm Z Shift of VELO: B=Nom All other meansconsistentwith zero ! DSlopeY Zmag DX at Zmag DY at Zmag <DZ>=(1.07±0.11) cm DZ Dg at Zmag

  14. 2 mrad Z-RotationVELO: B=Nom All other meansconsistentwith zero ! DSlopeY Zmag DX at Zmag DY at Zmag <Dg>=(2.56±0.30) mrad DZ Dg at Zmag

  15. Several ShiftsVELO: B=Nom DSlopeY Zmag In: DX= - 250 mm Out: DX= - (249±23)mm In: DY= 250 mm Out: DY= (188±50)mm DX at Zmag DY at Zmag In: Dg = 2 mrad Out: Dg = (2.38±0.33)mm In: DZ = 4 mm Out: DZ = (3.1±1.1) mm DZ Dg at Zmag

  16. Summarizing Still need to check rotations around X,Y axes and Z-scale but don’t expect any surprises

  17. Conclusions • Matching at the center of magnet appears to provide robustestimate of relative alignment between VELO and T-Stations. • 5000 min bias events gives reasonably good precision on offsets(Scale by 1/N to get a given precision) • Still need to check Da and Db and Z-scale, but don’t expectany surprises. • Document in progress. Full description of LHCb alignment needsto be put together. This is one piece of it. • Migrate (PAW) code to ROOT-based GaudiAlgorithm. Many thanks again to Matt , Eduardo, Juan and Marco Cattaneo for lots of help with software issues…

More Related