1 / 10

Semantics

Semantics. Ontology Background presentation at lunchtime Subteam to develop position paper UDEF MHP project example Controlled vocabulary CEFACT? Contexts How do we name contexts?. Methodology. Artifact driven Document and data-centric views

bunny
Télécharger la présentation

Semantics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Semantics • Ontology • Background presentation at lunchtime • Subteam to develop position paper • UDEF • MHP project example • Controlled vocabulary • CEFACT? • Contexts • How do we name contexts?

  2. Methodology • Artifact driven • Document and data-centric views • Documents are assemblies of re-usable data components (structure and content) • Design of logical model • Common core for re-use • Tools for managing models

  3. UBL Library Contexts Contexts BIEs Contexts Core Components BIEs Contexts Core Components BIEs Components Components UBL NDR Encode UNSM schemas Directories schemas schemas schemas Conceptual view (BOV) Design Logical Models Technologyview (FSV) Implementation Analysis Physical Models Format The RealWorld Messages/Documents The Big Picture Existing or ‘problem’ situation Required or ‘solution’ situation

  4. Extending the model • Separating logical and physical model attributes. • One model, two views • Physical (XML) extends logical • Business rules • Dependencies, constraints, contingencies • Mike’s position paper • Physical attributes for XML syntax • Facets, types, etc.. • NDR position papers (code sets)

  5. Document Schedule • Business context determines document requirements • Supply Chain Documents: • Order • Order Response • Order Change • Advance Ship Notice • Invoice • Proof of delivery/receipt • Time series • Inventory Report

  6. Procurement Activity

  7. Procurement Documents First Draft Build model

  8. Library Review • Closed 13th May • 68 Items • Approach, BIE, Model, Context and CC related • ARTS, NDR, SAP, SGML + 3 individuals • Clarified and categorized by editing team • Disposition this week • Revised schema by end of June.

  9. Schedule Lake Superior A Regency Regency Lake Superior B Regency Lake Superior B Regency

More Related