1 / 11

Review of Goals and Action Items from last time (O. Lupie)--5 min

Agenda. Review of Goals and Action Items from last time (O. Lupie)--5 min WFC3 and COS Instrument Development Status (G. Blue)--10 min WFC3 FSW Status and Schedule (G. Blue)--20 min WFC3 MOU & Ground System Development Status (O. Lupie & W. Baggett)--15 min

calla
Télécharger la présentation

Review of Goals and Action Items from last time (O. Lupie)--5 min

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agenda Review of Goals and Action Items from last time (O. Lupie)--5 min WFC3 and COS Instrument Development Status (G. Blue)--10 min WFC3 FSW Status and Schedule (G. Blue)--20 min WFC3 MOU & Ground System Development Status (O. Lupie & W. Baggett)--15 min Consolidated WFC3 Schedule (B. Rehm) --20 min Break  20 minutes COS FSW Status and Schedule (G. Blue) --20 min COS MOU & Ground System Development Status (C. Keyes & Wayne Baggett)--15 min WFC3 ICAL Status and Schedule (D. Fineberg) – 15 minutes Transition Planning (Grant Blue) --15 min Discussion & Lunch 1

  2. Revisit Goals: Schedule and schedule drivers review. Provide forum for discussion. Linkages and Interface clarification. Improve Information flow. Next splinter meeting planning. Talk directly with team counterparts. Establish perspective – how each piece fits into whole. Renew commitment for timely information exchange. 2

  3. Revisit Goals: Schedule and schedule drivers review. Provide forum for discussion. Linkages and Interface clarification. Improve Information flow. Next splinter meeting planning. Talk directly with team counterparts. Establish perspective – how each piece fits into whole. Renew commitment for timely information exchange. 3

  4. Action Items from March 27th Splinter • Plan for WFC3 and COS splinter at Ball Summer 2001  CLOSED • Initiate Tracking of WFC3 FSW and Ground System Development  CLOSED (Brian, Grant, Olivia, Wayne) [tracking and dependencies now included in Thai’s development schedule] • Initiate Tracking of COS FSW and Ground System Development  OPEN (unassigned) • WFC3 and COS need updated schedules for the delivery of test data suites  CLOSED (G. Blue) • Investigate merging of stimulus keywords with science data keywords – CLOSED – Plan OK (ICAL) • WFC3 MOU updated to reflect new schedules and March 27 splinter  CLOSED - O. Lupie • WFC3 MOU to address real-time TV support and connection to STScI  CLOSED – O. Lupie • Investigate COS and WFC3 Transition Plan Requirements  IN WORK B. Friedman to present @ splinter. • Scrub DRD Delivery Dates  CLOSED (G. Blue) • Get COS and WFC3 Timing Tests on Grant’s Schedule – Grant to work with Tom Wheeler  INWORK • Address Fire-Wall issues for remote access to COS and WFC3 Telemetry  CLOSED • Closed Actions from previous splinters: • Have SISEs participate in WOWG and COWG  CLOSED (R. Henry, STScI) • Address details of Tom Wheelers’ support of ACS, COS< and WFC3 timing tests  CLOSED (C. Blades, STScI) • Link from GSFC Private WFC3 pages to GSFC FSW/OPS site  CLOSED (Ball) • Provide Instructions to Ball and GSFC for accessing the STScI OPR system  CLOSED (W. Baggett, STScI) • DM-05 to be placed on Web  CLOSED (M. Draugelis, Ball)

  5. STScI - WFC3 Achievements since last time: Ops Telecon support: New error message review process is working well. Ground System: functionality available for basic UVIS Accum, IR Multi- Accum, Lamp Operation, Darks/Biases (Mike Robinson, Wayne Baggett). WFC3 Pipeline and Archive CDR – held on 10/16/2001 (Howard Bushouse) Delivery of AV-03 (Calibration Requirements) – October, 2001. TV Science Calibration report submission (Neill Reid, Frank Bartko). TV software support information gathering meeting – 08/2001. Recommendation for TV Data Handling System submission – 10/2001. Front-end Pipeline ICAL 5

  6. STScI WFC3 Memorandum of Understanding: • Driven by Thermal Vac. • Documents interfaces/dependencies  Ball, STScI, GSFC, ICAL. • Now focuses on two categories of STScI support: • Long-Term – OPUS Pipeline processing and long term Hubble Archive Storage. • Time-Critical- Specialized system for quick-look analysis with real-time archive. recent addition 6

  7. Key MOU Items – version 10/15/2001 • 5. Delivery of WFC3 OPS Test Bench Images – March 1, 2002 • Source: Grant Blue, Ball • Recipient: WFC3 Science IPT • Completion of Code and Unit Test Build 3.0 – March 30, 2002Source: Grant Blue, BallRecipient: STScI – ESS (T. Wheeler & FSET ) • 7. Delivery of Images from the Integrated Optical Bench - June 1, 2002. • Source: Grant Blue, Ball • Recipient: WFC3 Science IPT • 8. Delivery of TV-Specific and Optical Stimulus Keywords • Initial version –October 31, 2001, Complete version – May, 2002 • Source: WFC3 ICAL • Recipient: WFC3 Science IPT 7

  8. Key MOU Items – version 10/15/2001 9. Delivery of TV-Specific and Optical Stimulus Keywords Initial version 10/31/2001, Complete version 05/2002. Source: WFC3 ICAL Recipient: WFC3 Science IPT (H. Bushouse, WFC3 Pipeline and Archive) 11. OPUS Staging Disk Implementation – December, 2002 Source: WFC3 ICAL Recipient: STScI OPUS 12. Delivery of Beta Version of OPUS - June 1, 2002 (Final Version October 2002) Source: STScI OPUS Recipient: WFC3 Science IPT and WFC3 ICAL 8

  9. SEPT, 2001 ICAL Development OPUS Keywords DM-06 – snapshot telemetry and internal header data OS, TV Keywords DEC, 2001 SMS timing trials Test Bench “Early” Images MAR, 2002 Test Bench Image Suite Science SMS Testing Begins Build 3 C/U Complete Integrated Optical Bench Images Beta OPUS JUN, 2002 ICAL Proto Testing SEPT, 2002 Final OPUS KEY Front End Archive Pipeline/Archive DEC, 2002 TV Cal Support TV Readiness Test TV Thermal VAC Version October 15, 2001 MAR, 2003 Complete SMS Testing for SMGT 9 SMGT JUN, 2003

  10. STScI Ground System Development Linkages: 1yr between Build 3 C/U & SMGT 2mo between Full Suite Ops Bench Images and Beta OPUS 4mo between Beta OPUS and Final OPUS Deliveries Final Opus ready for TV ReadinessTest – Dec, 2002 2mo from TV ReadinessTest to start of TV. 10

  11. SEPT, 2001 ICAL Development OPUS Keywords DM-06 OS, TV Keywords DEC, 2001 1-2 month slip SMS timing trials MAR, 2002 Test Bench “Early” Images Test Bench Image Suite Build 3 C/U Complete Start SMS Testing Integrated Optical Bench Images JUN, 2002 ICAL limited to test of real-time system ICAL Proto Testing BETA OPUS SEPT, 2002 KEY Minimal testing of Final OPUS; no ICAL tests Front End Pipeline/Archive Final OPUS DEC, 2002 TV Cal Support TV Readiness Test TV Archive not ready for TV Readiness. No test-time Archive Schedule-Incompatibility Thermal VAC @ GSFC MAR, 2003 Version November 1, 2001 Incomplete SMS testing. Risk final Phase development effort. SMGT JUN, 2003 Complete SMS Testing 11

More Related