1 / 14

Gas sector reform path in H ungary

Gas sector reform path in H ungary. 2. The main characteristics of the Hungarian gas market. Share of Natural gas in primary energy consumption 43,3 % Settlements connected 87 % Transmission line 5 300 km

camdyn
Télécharger la présentation

Gas sector reform path in H ungary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gas sector reform path in Hungary 2

  2. The main characteristics of the Hungarian gas market • Share of Natural gas in primary energy consumption 43,3 % • Settlements connected 87 % • Transmission line 5 300 km • Distribution lines 77 687 km • Consumption 14,56 x 109m3 /a • Production (5% reduction/a)3,2 x 109 m3 /a • Import (from east/west Russian n. gas) 9 ,5 x 109 m3 /a • Storage ( mobile gas ) 3,3 x 109 m3 3

  3. Natural Gas Sales between 1994 - 2004 4

  4. Storage • 5 underground storage • Depleted gas fields • Mobile capacity 3,3 x 109 m3 • High-peak withdrawal 43,8 x 106 m3/d 6

  5. Present functional model of the gassystem 7

  6. Price of Natural Gas in Hungary,1985-2004 8

  7. Situation of the European Gas Market – Evaluation of the Madrid Gas Forum • No effective competition of supply side • No clear, transparent and harmonized access rules to network (in some cases negotiated TPA) • Dominant players on the European and on local market (through mergers, acquisition) • Different level of network tariffs • Commercial congestions, bottlenecks at cross border • Take or pay, long term contracts • The financial framework (security) for new network and storage investment is not clear 9

  8. Conditions of effective competition • Access to networks, storage, system services and to information • Number of players • Eligible customers with willingness to changesupplier • Market structure, which facilitates efficient competition • Market size, possibility of regional markets • Supply market - reserves, import 10

  9. Conditions of effective competition Access to the networks, storage, system servicesand to information • Some elements of Good TPA Practice is missing (clear definition of available capacities; effective management separation; gas secondary market;but prepared Codes) • Cross border capacity auctions , but for very limited available capacity(at gas the eastern connection is overbooked and the western connection /at Baumgarten/ is more expensive) • Weak rules on non-discrimination (preference for incumbent „public wholesaler, public suppliers”), weak promotion of new traders /lack of available capacity at eastern connection and at storage/ • Scarce cross border capacities and storage facilities in the gas transmission system (TSO – Regulator debate on future demand, on available capacities, on necessary developments) • Adequate network charges (Postage stamp method at present; preparation of Entry – Exit tariff for 2005) 11

  10. HUNGARY 20 000 Facts Forecast 18 000 16 000 14 000 /a 12 000 3 10 000 million m 8 000 6 000 4 000 2 000 0 2012 2013 2014 2015 2011 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 1990 1991 1992 1993 1994 1995 1996 2010 Suppliers Power Plants Industry Loss+own use of MOL Max. Min. Forecasted annual gas demand 12

  11. HUNGARY 120 100 80 /d 3 60 million m 40 20 0 2012 2013 2014 2015 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Loss+own use of MOL Fact Suppliers Power Plants Industry Max. Min. Forecasted daily peak demand 13

  12. Daily imported gas energy 2003-2004 45 40 35 /d 30 3 25 million m 20 15 10 5 0 04.02.01 04.03.01 04.04.01 03.01.01 03.02.01 03.03.01 03.04.01 03.05.01 03.06.01 03.07.01 03.08.01 03.09.01 03.10.01 03.11.01 03.12.01 04.01.01 Baumgarten (15°C) Beregdaróc (15°C) Daily imports 14

More Related