DTU Branddag

Safety. DTU Branddag. 04/2011. By Head of Dept. Master in Fire Safety Finn B. Steffensen. Knowledgeable User. Round-robin study of fire modelling Dalmarnock Fire Tests [ Uni. of Edinb. et al. ] A posteriori modelling (8xFDS+2xCFAST) Common test description

carlo
Télécharger la présentation

DTU Branddag

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Safety DTU Branddag 04/2011 By Head of Dept. Master in Fire Safety Finn B. Steffensen I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  2. Knowledgeable User • Round-robin study of fire modelling • Dalmarnock Fire Tests [Uni. of Edinb. et al.] • A posteriori modelling (8xFDS+2xCFAST) • Common test description • HRR of initial fire was provided • Pre-flashover well-ventilated round-robin studies -30%Texp +500%Texp [Rein et al. (2009), Fire Safety Journal 44, pp. 590-602] I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  3. 2*Sd mean Sol 1 Sol 2 Sol 3 ForretningsstrategiRound-NIRAS F ‘Tilfældigt’ Overvejet Vel-overvejet $ I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  4. Cost-benefitProblemer generelt F Omkostning til analyse Besparelse ved yderligere analyse $ Optimum I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  5. Cost-benefit Brand analyser F Omkostning til yderligere analyse Besparelse ved yderligere analyse $ Optimum I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  6. Funktionsbaserede brandkravEvaluering • EBST  • Arkitekter  • Brandrådgiver  • Andre  I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  7. Comparative Evaluation of Prescriptive, Performance based and Risk based Fire Safety in an Office BuildingMaria Boe Hede, Master Thesis, March 2011 Comparative = deemed to succeed I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt Areal = 2100 m2 Etagehøjde = 3,2 m Personlast 400 per Brandinstallation (Anv. 1/3): Automatisk sprinkleranlæg Automatisk varslingsanlæg 7

  8. Brandteknisk dimensionering Information om brandteknisk dimensionering I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt 8

  9. Brandteknisk dimensionering resultat Sprinklersystem virker Sprinklersystem virker ikke I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt 9

  10. Designværdier Sandsynlig værst (samtidig) • Personbelastning (max) • Personfordeling (værst) • Brandplacering (værst) • Brandtype (soot-yield) (sandsynlig værst) • Brandtilvækst (forventet værst) • Brandstørrelse (forventet værst) • Detection and warning • Reaction and decision • Travelling time, flugtvejsdefinition (trapper) og flugtvejspræferencer (30/70) • No first aid intervention • Virkemåde af brandtekniske foranstaltninger (control mode sprinkler (!!?), afstand fra brand til detektor og/eller sprinkler osv.) • Svigt af brandteknisk foranstaltning • ESL/FSL > 1, 1,3, 2,0 !!!!? I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  11. Risikoanalyser I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt 11

  12. I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt Reaction and decision time 12

  13. Risikoanalyse Resultat (50.000 simuleringer) I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt 13

  14. Commissioning, Operation and Management • Operation: • Design compliance should be ensured throughout the building lifetime • System mean life time, L: • Regular verification of FP-SOM by testing [Klote (2002)] - Other: 1E-5/hr [Klote (2002)] - Fan: 1E-6/hr L=23 months L=9 months I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  15. High rack storage400 mio EUR Storage New storage I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  16. Danish FursQRA-analysis – Traditional Fire Strategy ∑ loss/year = 3 mio. EUR I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  17. Danish FursQRA-analysis – Alternative Fire Strategy ∑ loss/year = 1 mio. EUR I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  18. [EN 12101-5]: =4,000 kW Methodology of Use • Design fire uncertainty – e.g. car fire • DK: Same building owner may be met with different design fires • Premovement time • Fixed: ~30 s => ~300 s • Distribution of : DK: Great variation within group of FSEs and within group of AHJs [Okamoto et al. (2009), Fire Safety Journal 44, pp. 301-310] Npers/Ntotal 1.0 trd Shopping Office I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  19. Mathematical Model • Fire modelling in PB design • A priori modelling • Leads to unclear risk levels • PBFC system must control math. assumptions 45 kg/s 75 kg/s 60 kg/s • 4. diff. math. models • Identical design fire I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  20. Methodology of Use • Buoyancy-driven vent modelling Vena contracta No VC No VC Vena contracta I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  21. Full-Scale Testing and Verification • Capacity of spiral stairs • AROS Museum of Modern Art, Aarhus (DK) • Hand rail in 1/3 point to improve capacity [Olafur Eliasson] Handrail I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt Improved Existing

  22. Full-Scale Testing and Verification • Full-scale test • 3 rep. tests with 200 pers. in each staircase • Findings Improved Existing Up 50% Compares to 0.7 m/s I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  23. Fire Protection and Safety: the next 25 years • Demographics and Urban Growth Patterns • 1. Densification in population • 2. Changes in transportation modes • 3. Growing aged and disabled population • 4. Declining work force • 5. Changing cultural impacts on fire safety and fire safety education • 6. Increased population living alone • 7. Focus on renovation/repair/reuse/maintenance • Materials and Technology • 8. Smart building materials • 9. Changes in hazards of building contents – materials and configurations • 10. Increased power demands • 11. New fire fighting technologies – sensors, robotics, information and decision making technologies • Environment, Energy, Sustainability • 12. Frequency of natural disasters – fires and floods • 13. Green building design • 14. Aging fire safety and electrical systems • 15. Alternative fuels and energy sources • 16. Declining water resources in populated areas • 17. Hazardous materials regulation impact on fire protection materials I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  24. Future work • Udfordringer: • Nybyg 130 mia kr • Ombyg 70 mia kr. • Acceptkriterier • Risikoacceptkurver • Forsikringsselskaber • Designbrande • Materialer • High rise Buildings I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  25. Eksamensprojekter • Evakueringsforsøg med grise !!!?? • Brandsikring af aerosoloplag • Udvendig brandspredning, med facadebeklædning af EPS • mmm I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt

  26. End of Presentation THANK YOU! [NRCC/MTQ: Full-scale fire test, Ville-Marie Tunnel, Montreal (CA)] I:\inf\pr-toolbox\overheads\Firmapresentation_nov2005.ppt