1 / 18

Complete Investment Casting Manufacturers Process - Turbo Cast

In this presentation describe about Complete Investment Casting Manufacturers Process and how it works. In this presentation include the formation of the wax injection, pattern removal, assembly, waxing etc...

Télécharger la présentation

Complete Investment Casting Manufacturers Process - Turbo Cast

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Turbo Cast investment casting manufacturers process

  2. Investment Casting Manufacturers Process • Investment casting – complete manufacturing process in which lost wax pattern is surface or laminate with a refectory ceramic raw material. • This raw material is used in internal calculation takes the shape or size of casting. • The wax is extra melted remove and molten metal is poured into the chamber where the wax pattern was. • The metal harden inside the ceramic mold and then the investment casting is isolated.

  3. Complete Process Steps • Wax pattern making • Pattern Assembly • Shell Coating & Building • Dewax/Firing • Metal Purity • Knockout • Finishing • Quality Testing • Packing & Shipping

  4. Wax pattern making Lost wax pattern is built to provide customer specifications and then will explain that way to produce final casting

  5. Pattern Assembly The lost wax model is removed from the injection tool. Assembly parts are tested for tolerance and then cleaned.

  6. Shell Coating & Building Successfully assembled parts after ceramic and stucco are applied to the sprue assembly to from heading section.

  7. Dewax/Firing The shell build sprue is the de-waxing by quickly heating in a boiler or autoclave leaving beyond the suite shell cavity.

  8. Metal Purity Now metal purity while the mold heat treat allows the liquid metal to flow easily through the mold chamber.

  9. Knockout The heat sprues are the isolated from the boiler and poured quickly. The metal purity shells are the set aside to cool.

  10. Finishing Excess extra metal is removed surfaces are perfect finishing and casting heat treatment.

  11. Quality Testing Each casting parts and equipment’s are inspected according to our customer specification and requirements.

  12. Packing & Shipping All the process done after castings are surly packaged by require and deliver to the customer

  13. Benefits of investment casting process • Creating freedom design • Various option to choose • Size freedom a small to large • Dimensions flexible • Perfect surface finish • Improved quality

  14. Turbo-Cast - Investment Casting Applications Our casting part is used in the aerospace, medical application, electrical application and defense industries Aerospace Casings Medical Applications Electronic Applications Defense Castings

  15. Quality Accreditations Certifications ISO 9001 : 2008 AS 9100 Rev. C Nadcap Certified

  16. Our Clients

  17. Contact Us Office Address "Satyam", 35 / Silver Sand, Opp - Big Bazaar, 150 Feet Ring Road, Rajkot - 360 001, India. Factory Address Survey No. 21, Village:- Biliyala, Rajkot-Gondal National Highway, B/h Pan Agri Export, Rajkot-360311 +91 2825 280301 / 280302

  18. Turbo Cast Thank you for visiting our presentation

More Related