Presentation to the Parliamentary Portfolio Committee on Arts & Culture Wednesday, 15 J une 2011. Overview of the NHC Legislative mandate Vision and Mission Strategic objectives 2009/10 Annual report 2009/10 Governance (Council & Committees)

ceri
Télécharger la présentation

CONTENT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation to the Parliamentary Portfolio Committee on Arts & Culture Wednesday, 15 June 2011

  2. Overview of the NHC • Legislative mandate • Vision and Mission • Strategic objectives 2009/10 • Annual report 2009/10 • Governance (Council & Committees) • Internal controls (internal audit & risk assessment) • Financial overview (budget 2009/10, AFS, Audit report) • Heritage programmes and Funded projects • Challenges CONTENT

  3. OVERVIEW OF THE NHC

  4. NHC is a Schedule 3A public entity under the DAC • The mandate of the NHC is contained in Section 4 (Objectives) of the National Heritage Act no. 11 of 1999 as per the objects of the Act as stated below: • Develop, promote and protect the national heritage for present and future generations. • To coordinate heritage management. • To protect, preserve and promote the content and heritage which resides in orature in order to make it accessible and dynamic. • To integrate living heritage with functions and activities of the Council and all other heritage authorities and institutions at national, provincial and local levels. • To promote and protect indigenous knowledge systems including but not limited to enterprise and industry, social upliftment, institutional framework and liberatory processes: and • To intensify support for the promotion of history and culture of all our peoples and particularly to support research and publications on enslavement in South Africa. LEGISLATIVE MANDATE

  5. VISION “To be the leading agent for the preservation, protection and promotion of the South African heritage, both tangible and intangible, for sustainable development” Currently reviewed as: “To build a nation proud of its heritage”

  6. MISSION To coordinate and transform the management of the heritage sector by: • Facilitating the development of heritage policies and advising the Minister on these and other heritage matters • Promoting, mainstreaming and foregrounding both tangible and intangible heritage • Facilitating the establishment of strategic partnerships with heritage stakeholders and role-players nationally, regional and internationally • Provide a framework that ensures the sustainable use, and the protection of heritage resources in social and economic development Currently reviewed as: “To transform, protect and promote South African heritage for sustainable development”

  7. STRATEGIC OBJECTIVES FOR 2009/10

  8. Strengthen policy development and advice • Increase resource mobilization and funding for the sector • Position the heritage sector as a significant contributor to socio-economic development– a national priority • Enhance the role of heritage in nation building– a national priority • Enhance coordination of heritage management • Facilitate, monitor and coordinate transformation of the heritage sector • Enhanced institutional capacity, financial and corporate governancecompliance • Enhance research and knowledge production • Promote public awareness, education and advocacy • Develop and enhance strategic partnerships with stakeholders • Maintain strong corporate image and identity STRATEGIC OBJECTIVES 2009/10

  9. Improve research, knowledge production and policy development. • Fund and develop sustainable community heritage initiatives. • Promote heritage in nation building and national pride. • Enhance public awareness, education and strategic partnerships. • Enhance administration, governance and business processes. STRATEGIC OBJECTIVES (NEW PARADIGM)

  10. ANNUAL REPORT 2009/2010

  11. COUNCIL COMMITTEES GOVERNANCE

  12. EXECUTIVE OFFICE STRUCTURE OF OPERATIONS

  13. Arts and Culture 2010 World Cup Task Team • The NHC was part of the Task Team that was assisting and advising the Department of Arts and Cultureon ensuring that South Africa realises the 2010 World Cup benefits for the sector. The Task Team was unfortunately dissolved by the Minister in January 2010 Other General Partnerships formalised are with: • Provincial Governments and Some Municipalities on Liberation Heritage Route • Eastern Cape Provincial Government on Ubuntu Programme • SABC on SATMA • CRATA on Ubuntu Programme and NHC attends meetings by invitation • DoBE on Heritage Education • ETC as outlined in the next slides SPECIAL PROJECTS & STAKEHOLDER ENGAGEMENT

  14. GOVERNANCE REPORT

  15. Quarterly reports to DAC for 2009/2010 and 2010/11 • NHC has submitted all four quarterly reports to the Department of Arts and Culture and Annual Report 2009/10 submitted and tabled in Parliament. • For the year 2010/2011 performance information has also been sent every quarter and Annual Report being prepared. NHC Strategic Plans 2009/2012, 2010/2013 and 2011/2014 MTEF Period • Strategic Plans 2009/2012, 2010/2013 and 2011/2014 were submitted to the DAC during February 2009, 2010 and 2011 respectively. • Draft Strategic Plans 2010-2013, and 2011-14 were submitted to the DAC during October 2009 and 2010 respectively. COMPLIANCE IMPERATIVES

  16. INTERNAL CONTROLS

  17. HUMAN RESOURCES’ MAIN STRATEGIC OBJECTIVES ARE ACHORED AROUND THE FOLLOWING: • Talent Management – On-going in line with Staff Retention Strategy • Performance Management – System is in place from previous years • Occupational & Health Safety – New Policy approved by Council on 20 January 2009 • Wellness and Safety – New policy approved by Council in November 2009 • Policy Review – For the year under review policies that were applicable had been reviewed in January 2010 and approved by Council on 20 February 2010. HUMAN RESOURCES

  18. FINANCE, ADMINISTRATION AND INTERNAL CONTROLS • Budget: Regular monitoring of budget and expenditure done • Assets: NHC assets verification process completed and asset register updated during the year under review. • Information Technology : Disaster Recover Plan (DRP) and Business Continuity Plan (BCP) were developed and approved. • Risk Management: Risk Management Strategy and Fraud Prevention Plan developed and approved by the Audit Committee during the year under review. • Internal Audit: Internal Audit Function established and is functional and assist the NHC to maintain effective controls by evaluating controls to determine their effectiveness and efficiency and make recommendations • Broad Finance Policies: Policies which applied in the financial year under review were reviewed during January 2010 to align with legislative imperatives. FINANCE, ADMINISTRATION AND INTERNAL CONTROL

  19. FINANCIAL OVERVIEW

  20. BUDGET ALLOCATION BY GOVERNMENT

  21. Government Grant – R48, 234, 952 • Roll Overs – R14, 409, 899 • Interest Received – R568, 000 • EC Provincial Government (Ubuntu) – R2, 849, 316 • Lottery Funding (SATMA) – R12, 621, 241 • Lottery Funding (LIBERATION ROUTE) – R3,547, 071 • Lottery Funding (UNSUNG HEROES) – R1, 111, 411 • Lottery Funding (YOUNG ARTISTS) – R2, 956, 869 BUDGET 2009/10

  22. BUDGET ALLOCATIONS: CORE BUSINESS VS NON CORE

  23. BUDGET ALLOCATIONS: PERSONNEL COSTS VS OPERATING COSTS

  24. Statement of Financial Position Assets Current Assets R14, 492m Non Current Assets R 1, 227m Liabilities Current liabilities R14, 019m Non Current liabilities R 246 Accumulated Surplus R 1, 254m FINANCIAL STATEMENTS 2009/10

  25. Statement of Financial Performance Revenue Government Grant R48, 435m Amortised Grant R 8, 179m Amortised Grant (National Lotteries) R 11, 704m Other Income R , 833 Total Revenue R69, 151m Expenses Operating Expenses R41, 086m Administrative R20, 141m Employee Costs R11, 723m Other Costs R 1, 578m Total ExpensesR74, 528m FINANCIAL STATEMENTS 2009/10

  26. Unqualified audit opinion for 2009/10 • Matters of Emphasis • Irregular Expenditures (Note 31) • Treasury Regulations require that bids not awarded through an open bid process be reported within 10 days to National Treasury and the Auditor General. • The three (3) contracts were not reported to National Treasury within 10 days as required. • Fruitless and Wasteful Expenditure (Note 31) • An official dismissed in 2008 handed over the matter to CCMA and thereafter initiated a legal process seeking compensation • NHC decided to settle the matter out of court based on the projection of legal fees and cost benefit analysis done. AUDIT REPORT 2009/10

  27. Corrective steps for Matters of Emphasis; • Implementation Plan for matters and findings raised by audit developed and tabled before the Audit Committee • New SCM policy aligned to SCM Framework issued by National Treasury developed, approved by Council and being implemented since 1 April 2010. • The contracts from whom these emanates had lapsed during 2010/11. No further expenditure incurred for the financial year 2011/12 and going forward. AUDIT REPORT 2009/10

  28. HERITAGE PROGRAMMES AND FUNDED PROJECTS

  29. LINKING PROGRAMMES TO MANDATE

  30. POLICY ADVICE & DEVELOPMENT • Draft Policy on Repatriation of Heritage Resources: The primary aim of the draft policy framework is to provide a clear policy guideline on the repatriation of heritage resources. 1st Draft Policy Framework has been completed and is in circulation for further inputs. (Please note paradigm shift toward developing Position Paper) • Draft Policy on Heritage Conservation and Development: The objective of the policy initiative is to provide a framework on mainstreaming heritage conservation into development (e.g. infrastructure development and planning). 1st Draft policy framework has been completed and is in circulation for further inputs. (Please note paradigm shift toward developing Position Paper) HERITAGE PROGRAMMES

  31. Draft Policy on Access to Heritage Institutions: This policy area seeks to provide an enabling framework for public access into heritage institutions, as access to heritage institutions by the public is often a challenge. Preliminary research has been completed and recommendations from the consultative process were considered. Draft policy framework in progress. (Please note paradigm shift toward developing Position Paper) • Draft Policy on Professional Standards and Ethics: This policy initiative seeks to set policy measures on code of ethics and professional standards for practitioners in the field of heritage management. An archival study on developing a policy framework in progress. (Please note paradigm shift toward developing Position Paper) • Draft Heritage Transformation Charter: This initiative seeks to present a blue print towards transforming the heritage sector. A draft with a proposed implementation plan has been completed and awaits handover to the Minister. HERITAGE PROGRAMMES

  32. The National Liberation Heritage Route is about the recognition of people, communities, icons, places/sites and the recording of epoch-making stories which had a significant impact on the South African struggle for liberation. • The NLHR will be configured as a network of sites, some nodes with world heritage status, others with national, provincial and local significance. • It’s a project that will provide a storyline about the movement and continuity of liberation activities, the dialogue across the country and trans-boundary co-ordination of the national liberation struggle. HERITAGE PROGRAMMES LIBERATION HERITAGE ROUTE & UNSUNG HEROES & HEROINES

  33. LIBERATION HERITAGE ROUTE (LHR) • It is a national programme towards the identification of sites linked to the liberation struggle for inclusion onto the nomination list & declaration thereof by UNESCO as a World Heritage Site. • The LHR was piloted in the Eastern Cape & provincial Summit held in 2007. • A tentative list has been accepted by the World Heritage Committee under UNESCO. • A Cabinet Memo has been sent to the Minister of Arts & Culture to initiate a parliamentary process to solicit national acceptance. • All Nine Provinces and Municipalities have been engaged and consolidation of inter-organisational networks and collaboration continues. • LHR Summits held in seven (7) provinces between July 2010 and March 2011, with Western Cape likely to host the last summit this financial year (2011/12) • National research initiated and still in progress through out all provinces HERITAGE PROGRAMMES (CONTINUED)

  34. LHR AS CONTRIBUTOR TO SOCIO-ECO DEV • A Business Case Study was completed in August 2009 and it affirms the socio-economic value and importance of the LHR for SA. • The Business Case contains the implementation framework and cost projections to the value of R1,6 billion over five years prioritizing infrastructure development and research • Funding for the initial phase of LHR programme has been secured from National Lottery especially for research and public consultation phase. • All Provincial summits with the exception of Western Cape have been completed. HERITAGE PROGRAMMES

  35. LIBERATION HERITAGE ROUTE (LHR) FOR SOCIO ECO DEVEVLOPMENT • Placement of the NLHR in the planning dimensions of government. • Site identification, content development and route mapping. • Development of the heritage sites in strategic nodes. • Development of knowledge, research and scholarship networks. • Preparation of the Nomination Dossier for World Heritage Site inscription. • Engagement of SADC countries for serial nomination of the NLHR and continued networking with UNESCO and the Advisory Bodies; IUCN, ICOMS, AWHF etc. • Approval of the NLHR by the National Cabinet HERITAGE PROGRAMMES

  36. HERITAGE IN NATION BUILDING - UBUNTU CAMPAIGN • An annual strategic programme centered on safeguarding and promoting Ubuntu for Nation building through initiatives for reclaiming, revival and restoration of the positive values of Ubuntu in society. Also the integration of Ubuntu into national programmes and policy frameworks for socio-economic development. • It derives from the adopted and approved strategy, in line with the mandates of the NHC, that of integrating living heritage into heritage management. • A national conference on “Reclaiming and Living Ubuntu for a Caring Society”, was held on the 31st of August 2010 with resounding success. This responds to the call made by the stakeholders and the Presidency for the nation to debate issues of morality. HERITAGE PROGRAMMES

  37. HERITAGE IN NATION BUILDING: KEY ACTIVITIES: UBUNTU CAMPAIGN • Ubuntu Imbizo and Awards Ceremonies (President Nelson Mandela 2006, President Kaunda, 2007; President Fidel Castro (international) Patrick Chamusa (national all received in 2008; and Dr Boutros Boutros-Ghali (International) and King Sabata Dalindyebo (national) in 2009) • Commemoration of Mandela Day in the Spirit of Ubuntu : 18 July 2009 – Kliptown in Soweto. • Mandela Day Celebration for 18 July 2010: Seminar - Inter-Generational Dialogues on the Meaning of Nelson Mandela ( Freedom Park – Pretoria). • Ubuntu Workshop (Ubuntu Dialogues) – Forum for the young and elderly citizens to exchange views and ideas. • Ubuntu in Action Community Initiatives – A close interaction between NHC and community projects that are based and foreground values of Ubuntu in Society. • Strategic Partnerships: MRM, CRL Commission, NHTL, Nelson Mandela Foundation, CRATA, Freedom Park , Education Department, Department of Correctional services & many others. HERITAGE PROGRAMMES

  38. AWARENESS, EDUCATION & STAKEHOLDER RELATIONS HERITAGE & EDUCATION OUTREACH • The project intends to integrate issues of heritage into the education sector. Through partnership with Department of Education the project involves schools from all provinces in a heritage education programme including research, debates, site visits and formal presentations at a 5-day camp. Schools compete and winners are selected by a panel of judges. • Strategic partners are the Department of Education, SANParks, Moral Regeneration, June 16 Foundation and Kara Heritage Institution. • 2010 Heritage & Education programme took place in Free State during September 2010 at Golden Gate Resort HERITAGE PROGRAMMES

  39. AWARENESS, EDUCATION & STAKEHOLDER RELATIONS Early African Intellectuals • Research and Publication based on the life and works of African Intellectuals (at the turn of the 21st Century) who contributed through writing to freedom and development of African people; 1 Vol. of the Publication has been successfully completed, with subsequent volumes planned subject to funding. • 2nd Vol. is focusing on the works of the following personalities: Albert Nzula; Magema Fuze, Reverend James Mata Dwane, Noni Jabavu, and Charlotte Maxeke. The Intellectual Making of Sol. T. Plaatje • The research project is based on the life and work of Solomon Thekiso Plaatje and will result in a publication. Progress reports have been submitted and the publication is expected to be finalised in the 2011/12 financial year. HERITAGE PROGRAMMES

  40. CONTRIBUTOR TO SOCIO-ECONOMIC DEV.: YOUNG INDIGENOUS ARTISTS • A programme to promote and preserve Indigenous Knowledge Systems through an indigenous art production technique and utilize visual art to promote heritage whilst providing an economic opportunity to talented unemployed youth. • Funding sourced from National Lottery for training and establishment of Cooperatives for the Artists. • National exhibitions held at the Grahamstown Arts Festival (2009 – 2010) & Macufe held in October 2010. • Partnerships with SEDA (Dti) to facilitate the creation of cooperatives and skills transfer to the Young Artists. HERITAGE PROGRAMMES

  41. AWARENESS, EDUCATION & STAKEHOLDER RELATIONS SOUTH AFRICAN TRADITIONAL MUSIC ACHIEVEMENTS AWARDS – [SATMA] • A project to promote, honour and recognise the contribution of traditional musicians to safeguarding of cultural heritage (Living Heritage). • The main event is preceded by provincial nominations on radio stations; development workshops, exhibition,announcement of artists and the launch, • An annual project in partnership with SABC and the Lottery. • Competition on all SABC radios resulting in an award ceremony • 5th SATMA anniversary and Awards even held in October 2010 at ICC, Durban. • SATMA Awards 2010 Launched in Cape Town, ICC Cape Town in May 2010. HERITAGE PROGRAMMES

  42. Key Strategic Objectives: • Funding disbursement through Funding Policy • Independent Funding Committee appointed • Tranche payments system used. • Grant agreements are signed with beneficiaries before disbursements are made. • Fundraising • Monitoring and Evaluation of Funded Projects in place • Services had been Outsourced • Periodic reporting done every quarter FUNDING AND RESOURCE MOBILISATION

  43. FUNDING

  44. FUNDINGFunds allocated by the NLDTF (Lottery) over a 3-year term

  45. Application was made for six projects but four approved for a period of three years and a grant agreement which informs transfers and reporting signed. • Approval was granted on Unsung Heroes and Heroines, SATMA, National Liberation Heritage Route and Young Indigenous Artists programmes while the Heritage Awards and Ubuntu awards were turned down • Redirections of funds for projects were done and approved by the National Lotteries in terms of the grant agreement • To date, three reports have been submitted and approved by the National Lotteries upon which the last tranche will be released • Save for the SATMA, these projects are new with no history as they had never been implemented before. The NHC had to conduct preliminary research on the three projects to determine implement ability subject to funding being sought. • Of the 4 approved, SATMA had a costing precedent since it had been running for three years prior to the application. FUNDINGFundsallocated by the NLDTF (Lotteries) over 3-years

  46. KEY ACHIEVEMENTS

  47. Improved Corporate Governance & consolidation of accountability measures. • Attained another unqualified audit report in 2009/10 making them six unqualified audit reports since inception. • All four quarterly reports for all the past years including the one under review (2010/11) were timeously submitted to the DAC. • Increased formal partnerships with stakeholders by way of MOU/As. • Enhanced implementation of funded heritage projects and programmes supported by National Lottery. • Official endorsements of the Liberation Heritage Route Project were received from the Provincial Councils and/or Governments . • Submitted Business Case on LHR to Ministry / DAC • Submitted Cabinet Memo on LHR to Minister for him to solicit support thereof at Government level. • Hosted eight (8) LHR provincial Summits so far, one in the pilot project launched in the Eastern cape province and the last (seven) between July 2010 & May 2011. • Secured funding for 2011 SADC & East Africa Workshop on LHR from Africa Africa World Heritage Fund (AWHF). • NHC is widely recognised for championing the heritage agenda. KEY ACHIEVEMENTS (CONTINUED)

  48. KEY CHALLENGES DURING 2009/10 & 2010/11

  49. The following key challenges are worth noting: • NHC could not effectively implement the Strategic Plan in the 2010/11 year under review because of the dysfunctional Council & Committees • NHC still without a Council since October 2010. • Budget cut of R5 million by DAC in terms of annual allocations impacted on the full implementation of the 2010/13 approved strategy. • Increased demand for support of heritage initiatives cannot be matched with financial resources owing to limited budget. • Insufficient capacity to match the growth & expectations on the LHR. • Lack of cohesion between the NHC and DAC Heritage Branch on programming • Insufficient Internal Research capacity. • Inadequate National research and policy management within the NHC. • Coexistence of Special Investigation Unit and AGSA negatively impacts on and/or constraints operational efficiency. • Inadequate capacity to increase knowledge production through research CHALLENGES RELEVANT TO NHC

  50. Overlaps in Heritage Legislation create confusion in discharging mandates amongst DAC, NHC and SAHRA ; • Heritage still perceived in isolation, and not as an integral part of National Priorities; • Heritage Management is a shared competency across all spheres of Government but yet not integrated into public programmes and policy frameworks • Recurring challenges of destruction of heritage resources due to lack of integrated infrastructure planning and development; • Heritage Sector still under resourced and under funded; • Lack of beneficiation model for the sector • Inadequate protection of Intellectual Property Rights of Heritage especially around Living Human Treasures and Indigenous Knowledge Systems CHALLENGES FACING THE SECTOR