Status of and Outlook for Nuclear Generation in the U.S. Energy Bar Association Mid-Year Meeting December 3, 2009 Scott Sitzer U.S. Energy Information Administration. U.S. Nuclear Status. Currently 104 nuclear reactors at 65 power plants in 31 States.

cerise
Télécharger la présentation

Status of and Outlook for Nuclear Generation in the U.S.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of and Outlook for Nuclear Generation in the U.S. Energy Bar Association Mid-Year Meeting December 3, 2009 Scott Sitzer U.S. Energy Information Administration

  2. U.S. Nuclear Status • Currently 104 nuclear reactors at 65 power plants in 31 States. • Nuclear is approximately 20 percent of all generation in the U.S. • Last new nuclear plant to come on line was Watts Bar 1 (TVA) in TN in 1996. • No new units have completed the application process since 1978.

  3. Operable U.S. Nuclear Units, 1957-2008

  4. Electricity Generation by Fuel Type - 2008

  5. Current Nuclear Developments • License Applications for 27 New Reactors at 18 Sites Received by NRC, but Not All are Being Actively Pursued • 3 new sites in Texas, Florida, and South Carolina being considered, all others on existing sites • New nuclear production not expected until 2016 at the earliest • One enrichment facility under construction in New Mexico; construction on a second in Ohio has been suspended; a third planned unit, in Idaho, is currently under regulatory review, and a fourth, using laser separation technology, is being considered for a site in North Carolina.

  6. Location of Potential New U.S. Nuclear Reactors

  7. Factors Favoring Future Nuclear Development • EPACT 2005 tax credits, loan guarantees, and insurance provisions • Need for additional baseload generation in the future • Zero-emission technology

  8. Barriers to New Nuclear Development • High capital costs • Waste disposal issues • Public perceptions

  9. Capital Cost Assumptions for New Generating Capacity

  10. Outlook • EIA’s reference case projects increases for nuclear capacity of about 12 gigawatts net by 2030, assuming current laws and regulations. • Total is made up of 3.4 gigawatts of expansion at existing plants, 13.1 gigawatts of new capacity, and 4.4 gigawatts of retirements. • But other scenarios show more or less depending upon assumptions about costs, demand, and emissions policies.

  11. Nuclear Generating Capacity, 2007, 2020, and 2030 (gigawatts) Source: Annual Energy Outlook 2009, U.S. Energy Information Administration

  12. Waxman-Markey Analysis • EIA analyzed the American Clean Energy and Security Act of 2009 (ACESA), the Waxman-Markey bill • Analysis shows significant impacts on nuclear capacity and generation through 2030 • Results are dependent on assumptions concerning banking, international offsets, and the costs of low-emission technologies

  13. Waxman-Markey Analysis (contd.) • Under the Basic ACESA case, nuclear generating capacity is 195 gigawatts (up 77 percent from the reference case), and generation is 1548 billion Kwh in 2030. • Under this scenario, nuclear would account for 35 percent of total generation in 2030, compared to 19 percent in the reference case projection. • Along with renewables, nuclear would be the primary source of replacement generation for coal and natural gas.

  14. Main cases in EIA’s analysis

  15. EIA’s Projected Capacity Additions by Fuel, 2007-2030: ACESA Analysis Source: EIA Analysis of the American Clean Energy and Security Act of 2009

  16. EIA’s Projected Generation by Fuel in 2030:ACESA Analysis (billion Kilowatt-hours) Source: EIA Analysis of the American Clean Energy and Security Act of 2009

  17. Thank You for your Attention!For more information: • Energy Information Administration home page ww.eia.doe.gov • Short-Term Energy Outlook www.eia.doe.gov/emeu/steo/pub/contents.html • Annual Energy Outlook www.eia.doe.gov/oiaf/aeo/index.html • International Energy Outlook www.eia.doe.gov/oiaf/ieo/index.html • Monthly Energy Review www.eia.doe.gov/emeu/mer/contents.html • U.S. Energy Information Administration • www.eia.doe.gov