An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Green Motors Review of Existing Deemed Savings Regional Technical Forum July 7th, 2009

  2. Background • The Green Motors Practices Group (GMPG) encourages high quality motor rewind practices to save energy. Green Motors Service Centers sign a commitment to follow the Green Motors rewind protocol and the GMPG follows up with QC/QA. • Concept proposed to RTF May 2007. Deemed savings originally approved July 2007, slightly revised July 2008.

  3. Savings Calculation: Key Inputs • Baseline Motor Efficiency = NEMA Premium Efficiency – Standard Rewind Efficiency Reduction Table: Standard Rewind Efficiency Reductions Original Source: MotorMaster+ Manual (p. 31: ≤40 hp = 1%; >40 hp = 0.5%) Another Source: “The Effect of Repair/Rewinding on Motor Efficiency”, EASA/AEMT (p. 1-5: 6 motors in 100-150hp range rewound without controls lost 0.6% efficiency) • “Upgrade” Motor Efficiency = NEMA Premium Efficiency • Assumed Motor Loading: <100 hp = 60%; ≥100 hp = 70% Source: “Achieving More with Less: Efficiency and Economics of Motor Decision Tools”, Advanced Energy. (Study of 100 motors showed average loading of 68.2%) • Hours of Operation Industrial Source: United States Industrial Electric Motor Systems Market Opportunities Assessment, published by US Department of Energy December 1999, Motor Challenge, see Section 1, page 42 Agriculture < 100 hp = 1800 hrs/year; ≥ 100 hp = 2000 hrs/year

  4. Cost Assumptions

  5. Economics Note: Preliminary estimated 6th Plan cutoff for cost-effectiveness is about 120 mils/kWh for lost-opportunity measures.

  6. Decision • Continue with deemed savings numbers? • Any adjustments?