PRESENTED BY ROBERT KELLY Geoff Graham

PRESENTED BY ROBERT KELLY Geoff Graham. MAQUARIE UNIVERSITY PROFILE. Located 12 Km North of Sydney C.B.D. Established 1966 210,000 Sq. Metres G.F.A. Approx. 22,000 Students (14,000 EFTSU) Set on Approx. 250 Acres. INNOVATIVE ENERGY MANAGEMENT. OBJECTIVES.

chase
Télécharger la présentation

PRESENTED BY ROBERT KELLY Geoff Graham

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRESENTED BY ROBERT KELLY Geoff Graham

  2. MAQUARIE UNIVERSITYPROFILE • Located 12 Km North of Sydney C.B.D. • Established 1966 • 210,000 Sq. Metres G.F.A. • Approx. 22,000 Students (14,000 EFTSU) • Set on Approx. 250 Acres

  3. INNOVATIVE ENERGY MANAGEMENT OBJECTIVES • Reduced Energy Consumption • Reduced Energy Costs • Environmental Considerations ---S.E.D.A Business Partner BUILDINGS AND GROUNDS OFFICE

  4. INNOVATIVE ENERGY MANAGEMENT Increased Energy Demand • Buildings now partially / fully air conditioned • Information Technology (IT) explosion • Extended operating hours / year BUILDINGS AND GROUNDS OFFICE

  5. INNOVATIVE ENERGY MANAGEMENT Deregulation - Original Savings Macquarie University entered the deregulation market in April 1997 for a one year trial. To do an effective comparison on pre deregulation and a new contract price, it is worth comparing the full 12 months periods - 1996 and 1998. BUILDINGS AND GROUNDS OFFICE

  6. INNOVATIVE ENERGY MANAGEMENT Deregulation - Original Savings Note 1:The change over year resulted in a drop in consumption, basically as a result of a new and confused industry. Billing data was not recorded correctly. This year combined pre-deregulated and deregulated charges. BUILDINGS AND GROUNDS OFFICE

  7. INNOVATIVE ENERGY MANAGEMENT Electrical Supply Contract In 1997, the University negotiated a one year contract with Victorian based retailer Powercor. In 1998, the University renewed the contract for 10 years. University “cushioned” against rising energy costs for term of this contract. University expect to pay market rates from 2008 under renegotiated contract. Current rates are 29% below the market rates. In real terms – at least 100% increase in costs. BUILDINGS AND GROUNDS OFFICE

  8. Retail Price Current 5.67 cents/kWh (inc GST) Retail increasess as per contract 40% Network Inreases 15% Increases due to metering charges 10% Renewable Energy Certificates (REC’s) 15% Compound increase to 10.84cents kWh (based on contract rates) After 30 June 2008, we are again vulnerable to market forces, which are currently 29% higher. Assume 20% increase in market price, retail price is expected to be greater than 13 cents kWh

  9. INNOVATIVE ENERGY MANAGEMENT Innovative EnergyManagement 4 Major Energy Initiatives • E11A administration building – geothermal ground source heat pump A/C • Library cogeneration plant. • E6A/E3A synergy system. • E3B heat recovery system BUILDINGS AND GROUNDS OFFICE

  10. E11A Administration Building

  11. E11A GEOTHERMALFIELD LOCATION E11A ADMINISTRATION BUILDING

  12. Schematic of Geothermal Field & Packaged Heat Pumps. E11A ADMINISTRATION BUILDING

  13. Low maintenance No visible outdoor equipment No mandatory cleaning No chemical treatment No waste water Longer equipment life No outdoor noise to control. Minimum plant room space requirements. High COP (kW in kW out) meaning lower electrical input to energy output ratio. No onsite emissions or odours. Environmentally friendly Cost efficient – 2 year pay-back INNOVATIVE ENERGY MANAGEMENT E11A Geothermal Initiative BUILDINGS AND GROUNDS OFFICE

  14. Cogeneration PlantPlant Exterior • The plant has been constructed to accept an extra 4 levels of Library extension. • Provision to power & air condition the extension is available.

  15. “NO WASTE” - EVEN HEAT FROM ENGINE JACKET & LUBE OIL IS RECOVERED CHILLED WATER TO CAMPUS STORAGE TANK 1.25 MILLION LITRES OF 4.5 DEGREEN CHILLED WATER 98 DEGREE HOT WATER FOR CHILLER OPERATION HEAT RECOVERY UNITS EXTRACT 2mWATTS OF HEAT FROM ENGINE EXHAUST GASES GAS DRIVEN GENSETS COMBINED POWER GENERATED 1.5 mWATTS ABSORPTION CHILLER 1230 kWr

  16. Cogeneration PlantCatterpillar Gensets. • Engines are V12 natural gas driven each producing 760kW of electrical power & 1mW of waste heat for recovery and production of chilled water at 4.50Celsius for air conditioning.

  17. Cogeneration PlantHeat Recovery Units • Heat Recovery Units capture heat from engine exhaust & transfer into process water for chilled water production from Absorption chiller.

  18. Cogen. Plant Absorption Chiller arrives for installation.Capacity 1230 kWr. Chiller is driven by recovered heat from engine exhaust gases. 980C water recovered from exhaust and pumped to chiller.

  19. Cogeneration Plant3 x Fluid Coolers • 3 x 1500 kW fluid coolers for dump heat. • Situated on roof of existing library. • Dump Heat will be reduced as waste heat is fully exploited possibly with proposed Aquatic Centre.

  20. Cogeneration Plant Storage Tank • Storage tank stands 22m high with a dia. Of 8.5m and a volume of 1.25million Litres. • Tank is stratified type with temperatures at 4.50C and 16.50c.

  21. Recognition • Macquarie University was awarded the Sustainable Energy Development Authority (SEDA) Green Globe Award for 2001 in the category of Innovation in Cogeneration

  22. INNOVATIVE ENERGY MANAGEMENT Energy Savings By Synergy E6A/E3A • E6A chillers connected to E3A 850,000 litre storage tank allowing chillers to charge tank at low night time tariffs and to discharge to loads during the day. • A twofold benefit is attained as chillers run at maximum load at night. Chillers fully loaded are more energy efficient than part loaded. BUILDINGS AND GROUNDS OFFICE

  23. Central equipment minimised for E3B due to tank capacity. Cooling tower risk eliminated from E3B Impact of chiller down time reduced due to energy storage. Higher COP(kW/kWr) for chillers due to avoidance of part loading. Low night time power tariffs. Increased chiller life cycle due to longer run and stop times. INNOVATIVE ENERGY MANAGEMENT SYNERGY ADVANTAGESE6A/E3A BUILDINGS AND GROUNDS OFFICE

  24. E3B HEAT RECOVERY EXHAUST AIR OUT DOOR AIR AIR PASSES THROUGH ENERGY WHEEL AND HEAT IS RECOVERED AS WHEEL ROTATES

  25. E3B INTERNATIONAL BUILDING

  26. Questions

  27. CONTACTS • Robert Kelly : rkelly@bgo.mq.edu.au • Geoff Graham : ggraham@bgo.mq.edu.au • Kerry Russell : krussell@bgo.mq.edu.au