An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Regulatory and development framework:the key role of TSO cooperation Hervé MIGNON RTE (France) Sopot, November 28th, 2011

  2. The European challenges The implementation of two strong political decisions • a new electricity generation mix (low carbon economy, German nuclear phase-out…) • an integrated internal electricity market (e.g. market coupling) requires • a highly integrated set of binding technical, economical and commercial rules • adequate tools to develop key infrastructures

  3. European energy choices Towards a low carbon economy

  4. New challenges for the technical integration of renewables New areas for wind and solar generation A summer week in Germany… wind solar generation New hydro solar wind

  5. Huge plans for offshore wind and the corresponding subsea infrastructure

  6. A new legal tool for pan-European grid planning: the Ten-Year Network Development Plan (‘TYNDP’) 2010-2014 2015+ The identification of all investment needs of –pan-European significance for the next 10 years

  7. Pilot TYNDP delivers Transmission investment projects that answer the three pillars of EU energy policy: • Security of Supply • Integration of renewable energy • The completion of the IEM Based on a strong economic assessment

  8. The development of « network codes » • Network codes developed by ENTSO-E to become pieces of the European legislation • Covering all relevant aspects in the technical and commercial fields • Defining a consistent economical framework for investment decisions • Already well advanced, to be achieved by 2014 A degree of integration unique in the world

  9. A key for success: the cooperation between TSOs • Strong role of TSOs in the power system and market design (e.g. ENTSO-E in Europe) • Deep knowledge of the vital constraints and of possible solutions • Long experience of cooperation between neighbors… necessary to keep the lights on A role for regional TSO associations