1 / 38

KOEL Khadki - Medium Engines

KOEL Khadki - Medium Engines. R PLANT RENOVATION ACTIVITY. KOEL Khadki - Medium Engines. TARGET- REINSTALLATION OF FOLLOWING PROCESS LINE AT SUPPLIER END . RA CON ROD Line at M/s Kalyani Forge Ltd. ( PAD ) , Sanaswadi Pune,

cheng
Télécharger la présentation

KOEL Khadki - Medium Engines

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KOEL Khadki - Medium Engines

  2. R PLANT RENOVATION ACTIVITY KOEL Khadki - Medium Engines TARGET- REINSTALLATION OF FOLLOWING PROCESS LINE AT SUPPLIER END . • RA CON ROD Line at M/s Kalyani Forge Ltd. ( PAD ) , Sanaswadi Pune, • 2R/3R Cr. Case Line at M/s Alka Engineering works, Shiroli MIDC Kolhapur. • R – Crank Shaft Line at M/s Amul Crank Shaft Pvt. Ltd. , Rajkot , Gujrat.

  3. KOEL Khadki - Medium Engines R PLANT RENOVATION ACTIVITY • TARGET DATE: - 01 JAN 2010 TO 05 MAY 2010. Three manufacturing lines shifting ,transportation and installation at supplier’s end. Shifting remaining machines within company premises.

  4. KOEL Khadki - Medium Engines R PLANT RENOVATION ACTIVITY

  5. KOEL Khadki - Medium Engines R PLANT RENOVATION ACTIVITY A) Planning / Information shared with suppliers. • Connected load in kwh on each line. • Total air consumption on each line. • Number of machines on each line • Total weight of each machine and it’s accessories. • Sequences of machine for phase wise disconnection .

  6. KOEL Khadki - Medium Engines R PLANT RENOVATION ACTIVITY • Planning / Information shared with suppliers. • ……. Cont. • Utilities required for machines. • For material handling convenient layout & vendor ,who will do job in time. e.g. crank case line. • Number of crane required as per their layout.

  7. KOEL Khadki - Medium Engines R PLANT RENOVATION ACTIVITY B) Preparation for shifting above processes line to respective location.

  8. KOEL Khadki - Medium Engines (B) PREPARATION …..cont. • For easy installation at supplier end tagging for electrical panel wiring, hydraulic, pneumatic hoses of each machines.

  9. KOEL Khadki - Medium Engines (B) PREPARATION ….. Cont. • Where it is possible electrical panel has been fixed to machine bed itself. • For electrical panels connector fitted for easy connection & disconnection ( near about 60 no’s of connector fitted to all m/c’s) • Special gauges made for checking of home positions of machines. • All machines backup taken. • All machines history card up dated copied on CD

  10. KOEL Khadki - Medium Engines (B) PREPARATION ……..cont. • Hard printing & binding of copies of all machine manuals, ladder diagram, electrical circuit diagram for supplier use. • Machine wise spares parts list prepared with it’s supplier information. • List of spares to be handed over with m/cs

  11. KOEL Khadki - Medium Engines (B) PREPARATION …….cont. • Measured sizes & weights of All machines & its accessories for estimating number & type of vehicles ,cranes & equipments required for the activity,

  12. KOEL Khadki - Medium Engines (B) PREPARATION …….cont. • Invited quotations from parties for shifting , transportation , crane service etc. • Study of requirement of manpower , equipments , to complete the activity. • Finalization of vendor for above activity. • Estimation of cost incurred for the activity.

  13. KOEL Khadki - Medium Engines (C) Actual shifting Activity • Connecting Rod line to M/s Kalyani Forge Ltd,(PAD) Sanaswadi ,Pune • 2R /3R crank case line to m/s Alka Engg. Works,Shiroli MIDC Kolhapur. • R Crank Shaft Line To m/s ACPL, Rajkot.

  14. KOEL Khadki - Medium Engines (a) CON ROD LINE SHIFTING • Total number of machine’s - 27 • Total connected load - 240.18 kw • Total weight of all m/c s - 80 Ton

  15. KOEL Khadki - Medium Engines a) CON ROD LINE SHIFTING Line Shifted in two phase. First phase -15 machine. Duration -13 Jan 2010 – 15 Jan 2010 (3 Day’s) Second Phase - 12 machines Duration -19 Jan 2010 – 21 Jan 2010 (3 Day’s)

  16. KOEL Khadki - Medium Engines a) CON ROD LINE SHIFTING Total day’s for shifting con rod line from KOEL to KFL sanaswadi ,Till job trial & dispatch -- 6 Day’s

  17. KOEL Khadki - Medium Engines a) CON ROD LINE SHIFTING • Total Expenses spend for shifting R Con Rod line at KFL ,Sanaswadi Pune • Vikas Crane & Transport Services –Rs 88780/- • Kudale & associate -Rs 3971/- • S.B. Electricales -Rs 11393/- • BSKE -Rs 86430/- • Rs 190574/-

  18. KOEL Khadki - Medium Engines KOEL Khadki - Medium Engines BEFORE RA CON ROD LINE

  19. KOEL Khadki - Medium Engines KOEL Khadki - Medium Engines BEFORE RA CON ROD LINE

  20. KOEL Khadki - Medium Engines KOEL Khadki - Medium Engines BEFORE RA CON ROD LINE

  21. KOEL Khadki - Medium Engines KOEL Khadki - Medium Engines BEFORE RA CON ROD LINE

  22. KOEL Khadki - Medium Engines KOEL Khadki - Medium Engines BEFORE RA CON ROD LINE

  23. KOEL Khadki - Medium Engines (b) 2R/3R Crank Case Line • Total number of machine’s - 27 • Total connected load - 365 kw • Total tonnage of all m/c s -262 Ton

  24. KOEL Khadki - Medium Engines (b) 2R/3R Crank Case Line • Line Shifted in three phase. • First Phase -03 machine. • Duration -26 Feb 2010 – 02 March 2010(5 Days) • Second Phase - 10 machines • Duration -13 Mar 2010 – 20 Mar 2010 (7 Day’s) • Third Phase – 14 Machines • Duration - 31 Mar 2010- 10 April 2010(7 Day’s)

  25. KOEL Khadki - Medium Engines (b) 2R/3R Crank Case Line Total day’s for shifting 2R/3R crank case line to Alka Engg.Works ,Kolhapur- Till job trial & 1st lot dispatch - 19 day’s

  26. KOEL Khadki - Medium Engines (b) 2R/3R CRANK CASE LINE SHIFTING Total Expenses spend for shifting 2R/3R Cr.Case line at Alka Engg.,Works,Kolhapur • Vikas Crane & Transport Services –Rs 88780/- • N.B. Dabriwal -Rs 38580/- • New Super Cranes - Rs 97266/- • Kudale & associate - • S.B. Electricales - • BSKE - Rs 262452/- • Rs 190574/-

  27. KOEL Khadki - Medium Engines Unloading of machines at Alka Engg,Kolhapur

  28. KOEL Khadki - Medium Engines Machine’s unloaded & taken at position

  29. KOEL Khadki - Medium Engines KOEL Khadki - Medium Engines POOJA BEFORE STARTING 1ST M/C AT ALKA ENGG. KOLHAPUR

  30. KOEL Khadki - Medium Engines Pooja Before Starting 1st machine at Alka Engg Works.

  31. KOEL Khadki - Medium Engines Switch ON 1st machine at Alka Engg ,Kolhapur

  32. KOEL Khadki - Medium Engines Line setup & component Trial work in progress

  33. KOEL Khadki - Medium Engines Line set up & component trial in Alka Engg.works.

  34. KOEL Khadki - Medium Engines Machine Setup at Alka Engg.Works ,Kolhapur

  35. KOEL Khadki - Medium Engines MACHINE FOUNDATION IS IN PROGRESS

  36. KOEL Khadki - Medium Engines TEMPARING M/C LOCATION

  37. KOEL Khadki - Medium Engines SUMMARY SHEET Since last four month’s foll. No. of m/c’s shifted in Ra section. CON.ROD CRANK CASE CRANK SHAFT EXT INT EXT INT EXT INT NO.OF M/C SHIFTED 27 30 27 - 21 17 CONN. LOAD KWH 241 150 365 - 457 300 TOTAL TON SHIFTED 80 130 262 - 130 145

  38. KOEL Khadki - Medium Engines SUMMARY SHEET • Total No of machine’s shifted -122 nos. • Total connecting load for shifted m/c -1063 kwh • Total tonnage of machine shifted from Ra section -750 ton From 13.01.2010 To 10.05.2010 Total Day’s- 115 Average ton shifted per day-6.52 ton.

More Related