Alley design not typical

Alley design not typical. Dry pond diversion at navy yard. Tree box. Interim biosoil amendment. constructibility. Infiltration and vegetated swale. Bmps in a series addressing multiple issues. Pretreatment?. Hight density streetscape. Courtesy of Forest City Development and VIKA.

cheri
Télécharger la présentation

Alley design not typical

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Alley design not typical

  2. Dry pond diversion at navy yard

  3. Tree box

  4. Interim biosoilamendment

  5. constructibility

  6. Infiltration and vegetated swale

  7. Bmps in a series addressing multiple issues

  8. Pretreatment?

  9. Hightdensity streetscape Courtesy of Forest City Development and VIKA

  10. Simpler idea

  11. Porous/Pervious Pavements • Sustainable Characteristics and Benefits : • Americans with Disabilities Act (ADA) Compliant • Shoes, wheel chairs, crutches • Noise Reduction • Stormwater Mitigation/Management • Cooler Surface • Supports Tree Growth Source: Interlocking Concrete Pavement Institute (ICPI) Source: Interlocking Concrete Pavement Institute (ICPI) GHP CENTER for TRAINING and DEVELOPMENT

  12. Compost amendments and filter soxx Source: Filtrexx GHP CENTER for TRAINING and DEVELOPMENT

  13. Keep Erosion Controls in Place Until Drainage Area is Stabilized but it didn’t infiltrate Irving St Images P5240081 & P4260061

  14. Unapproved Material Substitutions Why this didn’t infiltrate

  15. Inadequate Erosion Control or Protection of BMP Areas

  16. Plant Density PlantLocation and density issues

  17. Additional Benefits ofGreen Infrastructure • Reduces heat island effect • Improves air quality • Provides wildlife habitat and recreational space • Improves energy efficiency • Improves urban aesthetics • Increases property values • Often less expensive than conventional approaches • Stewardship USNY Permeable Pavement and Bioretention Pavers with repaving

  18. Planter box alternative Source: Army: Public Works Technical Bulletin 200-1-62