An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Process Visualization Method developped by Christoph Locher, Dr. Lüder Tockenbürger and Dr. Mathias Müller

  2. Contracts include Processes • A contract is ruling a business between two parties • In performing contracts, the parties handle processes • The contract is – among ohters – to describe such processes including the rights and duties of the parties involved

  3. Visualization of Processes • Design and description of processes are much easier if processes are represented in graphical form • Visualization of processes helps drafting contracts and reviewing drafts

  4. ... is tailored to contract drafting • ... is very simple • ... limits itself to : • 3 symbol elements • 3 colors • 3 line symbols • 3 rules • ... does not require prolonged training • ... can be applied in the meeting when discussing a contract

  5. 3 Symbol Elements Event-Element (square) stands for an event or an action (advancing the process by one step). Example: A cetain piece of information is received by one party (an event), or a party submits a quotation (an action). Decision-Element (rhombus) stands for a decision situation. Example: Does the party want to accept a suggestion ? Legal Consequence-Element (coat of arms) stands for a legal consequence occurring at a certain stage in the process. Example: The product supplied is accepted.

  6. 3 Colors 3 Colors are sufficient for 2-Parties-Contracts Yellow: the one party is involved Blue: the other party is involved Green: both parties are involved (typically for legal consequence elements)

  7. R O 3 Line-Symbols Arrow: Links two symbol elements; the element at the tip follows the other one in time Arrow with R: Links two symbols and states that the party responsible for the element at the tip is authorized to perform the action visualized by this element Arrow withO: Links two symbols and states that the party responsible for the element at the tip has the obligation to perform the action visualized by this element

  8. 3 Rules Rule 1: Every branch must end with a legal consequence element. Rule 2: A decision element is necessarily followed by – at least - two branches, the process splits. Rule 3: If a loop is made, the number of passes through this loop must be specified.

  9. in Practice • Use a role of paper (or EasyFlip) • Post-it Stickers for the Symbol-Elements • White Board Marker for the arrows • No perfection is required ! • Follow the rules and try to design processes that make sence and can be understood !

  10. Visiolex-Box Order a Visiolex Box with all necessary items (such as all relevant stickers, white board marker, booklet) with christoph.locher@amglaw.ch