An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Metropolitan Area (TMA) Category 2 Projects Funding Target Formula • 32.50% Total VMT (on and off State Hwy System) • 22.19% Population • 16.88% Lane miles (on System) • 14.06% VMT (trucks only) • 6.88% Percent population under federal poverty level • 6.56% Fatal & incapacitating crashes • 0.93% Centerline miles (on System)

  2. Urban Area (non-TMA) Category 3 Projects Funding Target Formula • 22% Total VMT (on and off State Hwy System) • 26% Population • 11% Lane miles (on System) • 6% Centerline miles (on System) • 15% VMT (trucks only) • 9% Percent population under federal poverty level • 11% Fatal & incapacitating crashes

  3. Statewide Connectivity Corridor Projects • Mobility Corridors – based on congestion • Connectivity Corridors – 2-lane roadways requiring upgrade to 4-lane divided. • Strategic Corridors – strategic corridor additions to the state highway network. An example would be the Ports-to-Plains. Selections based on engineering analysis of projects on three corridor types:

  4. Challenges To Be Addressed

  5. The Work Group will begin to address as many of the eight individual challenges as allowable in time permitted. Challenges to be addressed are as follows:

  6. Challenges to be Addressed: • Determining the appropriate amount of right of way acquisition and consultant dollars that could be allocated by respective category to the MPOs;

  7. Challenges to be Addressed: • Determine an allocation method;

  8. Challenges to be Addressed: • Scheduling each area’s use of the total allocation

  9. Challenges to be Addressed: • Tracking the actual use of the dollars and balancing future scheduling with past obligations;

  10. Challenges to be Addressed: • Educating Districts and MPOs on the use of its area’s allocation and what can be accomplished with the funds;

  11. Challenges to be Addressed: • Temporarily continuing data maintenance to fulfill legislative reporting requirements (the Department is currently working on changes to enable tracking of total project costs that should be fully implemented by summer 2006);

  12. Challenges to be Addressed: • Investigating legal issues (contained in the Texas Administrative Code and the Texas Transportation Code); and

  13. Challenges to be Addressed: • Developing recommendations to present to the Districts and MPO.