1 / 3

Baseline Management Process

Baseline Management Process. IDPS Splinter May 10, 2011. Baselines, Branches and Merges. shared_csi_b1.5. Mx5. Mx6. Algorithm drops. Mx7. Algorithm drops. NPP. i1.5. Wholesale migration from NPP to State 2. Migrate selected Mx6 functionality to State 2 by PCR.

chuck
Télécharger la présentation

Baseline Management Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Baseline Management Process IDPS Splinter May 10, 2011

  2. Baselines, Branches and Merges shared_csi_b1.5 Mx5 Mx6 Algorithm drops Mx7 Algorithm drops NPP i1.5 Wholesale migration from NPP to State 2 Migrate selected Mx6 functionality to State 2 by PCR Migrate selected algorithm drops to State 2 by PCR Migrate selected Mx7 functionality to State 2 by PCR Migrate selected algorithm drops to State 2 by PCR Migrate to NPP only by selected State 2 PCRs i2.1 State 2 Incr 1 CUT Incr 1 CUT Incr 1 CUT Incr 1 CUT shared_csi_b2.1 Time i branches = official deployment Shared_csi branches = development and integration • i2.1 and shared_csi_b2.1 branches are currently based off of mx4 • Mx5 is the NPP Launch baseline • Mx6 and beyond only migrate algorithm and other changes to State 2 by PCR (i.e. no “wholesale migrations”) • Algorithm drops may occur between Mx merges. • Algorithms drops from NPP may be migrated to State 2 • Functionality and algorithm changes from State 2 may be migrated to NPP by PCR if desired.

  3. Relevant Work Instructions • PCRs • CDM-J-119 Problem Change Report (PCR) Life Cycle.docx • CDM-J-064 Problem Change Report Board (PCRB) Process.docx • Baseline Management • CDM-J-056A Software Build Release and Deployment Review.docx • CDM-J-170 Release Content Review.docx • SE-J-166 Maintenance Release Review.doc • Branching • SW-J-199 Mini Increment Development Approach.docx

More Related