An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Track structure on bridges & channel sleepers C M Gupta Sr. Prof.(Bridge/2) IRICEN, Pune

  2. REFERENCES • IRPWM Para 272 to 278 • CS no.102,105,116,125,128,131

  3. Introduction Track structure on bridges are different from that on embankment, such as : Ballasted deck bridge – Rails, fittings and sleeper are similar to the track structure on approaches except guard rails are provided to prevent overturning of derailed rolling stock. These type of deck are used over masonry arch bridges, RCC/PSC I girders/slabs and boxes, composite girders, PSC I girders/PSC box girders. On steel girders, ballasted deck is made by providing steel troughs which poses problem for repairs / maintenance to corrosion effected members

  4. Steel trough ballasted deck bridge

  5. Open deck bridge

  6. Steel trough ballasted deck bridge Open deck bridge

  7. Open deck bridge – Space between two sleepers is open hence called open deck. • To support rails on steel girders following type of sleepers are being used : • Wooden sleepers – • are lighter in weight, • easy for handling on bridges, • easy in machining for placements, • minimum simple fittings to hold the rails as well as in maintenance repairs. • Rail free fastening such as rail screw / dog spikes and canted bearing plates over wooden sleepers provided for independent movement of rail. • Due to scarcity of wood and restriction of use wooden sleepers on Indian Railways, these are not being used now a days.

  8. Steel channel sleepers – • Introduced as substitute to bridge timbers during 1992 having drawing No. RDSO / B-1636 and B-1636/1. • Subsequently to minimize number of fittings and ease in fabrication and maintenance, revised drawings were issued by RDSO, drawing No. B-1636/R2 and B-1636/1/R2 of channel size 150x75mm. • To avoid thicker packing plates over top flange plate of plate girders of 12.2m, 18.3m and 24.4m spans additional drawing No. B-1636/2 is also issued with increased height of channel size 175x75mm.

  9. Bridge Approaches • Rail joints should be away from abutment by 3m in case of single rail & 6m in case of SWR. • Minimum 26m (2 rail length) in case of single rail & 36m (3 rail length) in case of SWR should be well anchored. • Spacing of sleepers not more than 60cm.

  10. Bridge Approaches • 100m approach length should have LWR ballast profile. • Ballast retainers should be provided in one rail length. • If a curvature of 3 degree & more on BG or 5 degree & more on MG exists, check rail should be provided.

  11. Bridge proper • Preferred position of rail joints is 1/3rd of span, to avoid excessive shear force & bending moment. On spans less than 6.1m avoid joints. • Rail free fastenings on bridge to allow independent movement of rail & girder. • 26m long rolled rails may be laid on bridges with 1m long fish plate & 6 bolts. • Joggled fish plate with clamps or two far end bolts on good AT welds shall be provided on bridges having length of water way as 100m or more and on approaches up to 100m length.

  12. LWR/CWR ON BRIDGES BRIDGES WITH BALLASTED DECK (WITHOUT BEARING) (4.5.6) LWR/CWR can be continued over bridges without bearings, i.e. on slabs, box culverts and arch bridges. BRIDGES WITH/WITHOUT BALLASTED DECK (4.5.7) • Bridges on which LWR/CWR is not permitted/ provided shall be isolated by a minimum length of 36m well anchored track on either sides. • LWR/CWR shall not be continued over bridges with overall length specified in subsequent para for BG (and not more than 20m for MG).

  13. LWR/CWR ON BRIDGES BRIDGES WITH RAIL-FREE FASTENINGS (single span not exceeding 30.5m and having sliding bearings on both ends) Para4.5.7.1(i) • Overall length as per Table-1. • Rail free fastening throughout the length of bridge. • The 50 meter approach on both side well anchored. • Ballast section of approach track upto 50 m shall be heaped upto foot of rail on the shoulders and well compacted & consolidated condition during extreme summer & winter.

  14. LWR/CWR ON BRIDGES • BRIDGES WITH RAIL-FREE FASTENINGS AND PARTLY BOX ANCHORED (single span not exceeding 30.5m and having sliding bearings on both ends): Para 4.5.7.1(ii) • Overall length as per Table-1. • 4 central sleepers on each span box anchored. • Bridge timbers - Individual notches for rivet heads. • Track on approaches well anchored. • Inspection/cleaning of bearing – March & October. • Lubrication of bearing – Once in two years.

  15. TABLE –1MAXIMUM OVERALL LENGTH OF BRIDGES PERMITTED ON LWR/CWR ON BG (IN METER)(PARA – 4.5.7.1. (I) & (II)(single span not exceeding 30.5m and having sliding bearings on both ends)

  16. LWR/CWR ON BRIDGES (Para 4.5.7.iii) Welded rails may be provided from pier to pier with rail-free fastenings and with SEJ on each pier. The rails shall be box-anchored on four sleepers at the fixed end of the girder if the girder is supported on rollers on one side and rockers on other side. In case of girder supported on sliding bearings on both sides, the central portion of the welded rails over each span shall be box-anchored on four sleepers.

  17. LWR/CWR ON BRIDGES (Para 4.5.7.1 iv) • LWR/CWR may also be continued over a bridge with the provision of SEJ at the far end approach of the bridge using rail-free fastenings over the girder bridge. • The length of the bridge in this case, however, will be restricted by the capacity of the SEJ to absorb expansion, contraction and creep, if any, of the rails. • The length of the bridges with the above arrangement that can be permitted in various rail temperature zones for LWR/CWR with SEJ having maximum movement of 120 mm and 190 mm are as per table

  18. MAXIMUM OVERALL LENGTH OF BRIDGES PERMITTED ON LWR/CWR ON BG (IN METER) (PARA – 4.5.7.1. (iv) .

  19. LWR/CWR ON BRIDGES PARA 4.5.7.1 (V) New Para Added As per CS no. 9 • Welded rails may be provided over a single span bridge with rail free fastenings and SEJs at 30m away from both abutments. (Span as per table) • The rail shall be box anchored on four sleepers at the fixed end of the bridge if bridge is supported on rollers on one side and rockers on other side. • In case of bridge supported on sliding bearings on both sides, the central portion of the welded rails shall be box anchored on four sleepers. On both side of approaches fully creep anchored fastenings shall be used.

  20. LWR/CWR ON BRIDGES PARA 4.5.7.1 (V) New Para Added As per CS no. 9 • The length of single span bridge permitted.

  21. Longitudinal profile of track • No camber on standard plate girder. • On open web girders having span 30.5m & more are provided with Camber. • While re-timbering/ fixing sleepers, it should be ensured that longitudinal level of rails follows the camber of girder.

  22. Restrictions for SWR • If SWR is symmetrical to center line of bridge, SWR may be continued on un-ballasted decks up to 13.3 m. span. • If SWR is laid un-symmetrical to center line of bridge, SWR may be continued on un-ballasted decks only up to 6.1m opening.

  23. Hook Bolts & Guard Rails Hook Bolts • Straight lipped – on builtup girders • Slopping lipped - on rolled girders. Guard Rails length • BG - L1=1825mm, L2=4875mm, a =250+_50 • MG - L1=1825mm, L2=3655mm, a =200+_25 L1 - Length of straight Guard Rail Outside Ballast Wall L2 - Length of Guard Rails to be bent a - Clearance between Guard rail and Running Rail

  24. Guard Rail

  25. Precautions while fixing guard rails • Top table of guard rail should not be lower than 25mm from main line. Same section as far as possible. • Guard rail should be notched for spikes at all sleeper locations. • Two spikes towards the centre and one spike on the opposite side • Tie bar runners provided to avoid bunching • Guard rail should form a joint at free end of girder with elongated holes to permit movement of girder.

  26. Precautions while fixing guard rails • G/rail should be provided on all girder bridges, whether major or minor. • G/rails should also be provided on all major & important ballasted bridges & on such other minor bridges where derailment may cause serious damages. • Flat top, arch & PSC girder with deck slab where guard rail is not provided, ballast filled up to top of sleeper between parapet walls

  27. STEEL SLEEPERS ON BRIDGES

  28. STEEL SLEEPERS ON BRIDGESIRPWM CS no. 128 • Steel sleepers refer to steel channel sleepers & H-beam sleepers both. • Steel sleepers to be used should be fabricated as per approved drawings. • For girder bridges on curves, steel sleepers should be designed to suit the specific locations.

  29. STEEL CHANNEL SLEEPERS – • Two types of steel channel sleepers are used: • Made from ISMCs • ISMC150x 230 mm size of cross section, fabricated by rolled channelISMC150x75mm(Drg No.B-1636/R2&B-1636/1-R2) • ISMC 175 x 230 mm size of cross-section, fabricated by rolled channel ISMC-175 x 75 mm (Drg No. B-1636 / 2) .

  30. STEEL H-BEAM SLEEPERS – • Made from ISHBs • H-Beam is designed using standard ISHB – 200 @ 37.3 Kg/m as per standard steel. • Suitable for Welded Girder Bridges- BG (Drg. RDSO / B-1636/4 & RDSO / B-1636/5

  31. Specification of steel for sleepers – • Steel channel sleeper is critically loaded dynamic structure which directly supports rails of track on girders hence following steel shall be used: a) Bridges located where service temperature does not fall below 0C, steel used shall confirm to IS- 2062 grade 'B0' fully killed. Note: Till such time rolled channel not available of steel to IS - 2062 grade "B0" steel confirming to IS-2062 'A' fully killed can be used. b) Bridges located in below sub zero temperature areas, steel shall be confirming to IS-2062 grade "C" fully killed. • Note: Steel used for fabrication should be tested one and must have mill test certificate clearly indicating the specification and fully killed. Fabricator should maintain the record of steel used with cast mark for verification if required at later date. Rolled section should be within the rolling tolerances and surface defects prescribed in IS-1852.

  32. STEEL SLEEPERS ON BRIDGESIRPWM CS no. 128 Sleeper spacing : • Maximum centre to centre spacing should be 600mm. • The clear distance between joint sleepers should not be more than 200mm. Fabrication of steel sleepers & other components: • Fabrication of steel sleepers & its protective coating should be in conformity with BS-45 issued by RDSO. • For girder, location of steel sleepers should be marked & numbered after detailed survey of the girder. • The fabrication of steel sleeper should be location specific considering the girder centre, top flange cover plates, rivets etc.

  33. Length – • Length of steel channel sleeper depends on the type of steel girder bridges and its span

  34. Details of steel channel sleeper – • Sleeper is made by 2 ISMC 150 x 75mm or 175 x 75mm, which are kept back-to-back 80mm apart to make width of 230 mm. Both channels are connected in web by 'T' & plate type diaphragms with fillet weld. • 'T' shape diaphragms are connected below 'T’ head bolt connecting rail clips. In case of loosening of nut, bolt will rest on 'T' diaphragm, so that clip will be in position as well as prevent falling down of bolt. Note: • The top flange plate of welded girder has different width at both ends and at middle portion of girder. Therefore, Length of sleepers on A and B location are different.

  35. Canted bearing plates for rail seat are connected to top flange of both channels with rivets. • Stiffener plates are provided below the rail seat with fillet weld in web between top and bottom flange of both channels as well as in the middle of sleepers. • Track fittings for steel channel sleepers – • Rail fastening arrangement for sleeper is as per Drg No. RDSO/T-5155 to 5164 for BG (60 Kg running rail and 52 Kg guard rail) and as per Drg No. RDSO/T-5197 to 5200 (for 52 Kg running rail and 52 Kg/ 90R guard rail). • Fastening arrangements comprise of a) Bolt- ‘T’ head bolts with spring washers and nuts are used to clamp the clip to canted bearing plate to hold rails. ‘T’ head will facilitate insertion of bolt from top and vice versa removal of the same.

  36. Clip Rubber pads ‘T’ Bolt b) Clips - Either side of rail, clips are provided and tightened with ‘T’ head bolts to keep the rail in Position i.e. Clip prevent lateral movement and uplift of rail but it will allow rail to move longitudinally to facilitate free movement of rail and girder as rail free fasteners. Guard rails are also anchored with both sides (crosswise) by bolt and clip to sleeper top flange. c) Rail Pads - Grooved rubber pads are placed below the rail on canted bearing plates. A 10 mm GRSP of suitable size is to be provided between rail and sleeper. To provide smooth surface between rail and pad 2 mm stainless steel plate is embedded in rubber pad.

  37. Clip fittings

  38. Fittings for Guard rail

  39. Rubber pads and pad plate

  40. Nylon chord reinforced elastomeric pad Holes to be made as per rivets at site and sealed with red lead or other paint

  41. Hook Bolt arrangement: Pad Plates

  42. Hook Bolt arrangement: 25 mm rubber pad

  43. Laying of steel sleepers on bridges: • In case of bridge on curves, the location of steel sleepers should be marked after taking into account the realigned curve. • In case transition curve lies on bridge fully or partially, the thickness of steel pad plate should take care of cant gradient. • Before laying steel sleepers, creep if any, should be pulled back and rail joints should be so located that after laying sleepers, joints should not become supported joints.

  44. Laying of steel sleepers on bridges: • The top flange of girder should be cleaned of paint & repainted as specified. • Existing cross level & misalignment of girder/track should be corrected in advance before steel sleeper laying. • At least JE/II/Pway should supervise the laying work. • Single pad plate below steel sleeper is preferable. • Packing plates can be used along with pad plate to adjust parameters, wherever required. • The pad plates not required where neoprene pad is provided to cover the rivet head.

  45. Maintenance After laying steel sleepers - • Tightening of all fittings including hook bolts should be done once in 15 days for initial one month. • Thereafter it should be done once a month for next six month & subsequently it should be on need basis as observed by inspecting officials. • Guard rail fittings should be tightened once in three month for 1st six months and thereafter on need basis. • The above will be in addition to daily attention by keyman.

  46. Maintenance • Replacement of grooved rubber pad & elastomeric pads shall be done on condition basis. • Suitable stock of spare fittings should always be maintained keeping different types of girders in view. • Suitable quantity of the steel sleepers along with fittings should be kept as emergency reserve. • Emergency reserve stock of channel sleepers should be maintained keeping different types of girder in view. • In case galvanized coating gets damaged, it should be repaired as specified.

  47. Inspection schedule (only for channel sleepers) • By ADEN and SSE/SE(Pway) Incharge: Once in a year by rotation. • Condition of channel sleeper shall be thoroughly inspected. During intensive inspection, the condition of rivets, distortion or crack in sleepers or any sign of crack in girder flange and tightness of fittings should be looked for. • All loose fittings should be tightened after inspection, if required. • Watch must be kept for few days in the beginning as per need.

  48. Inspection schedule (only for channel sleepers) • SSE/SE/Pway and SSE/SE/S&T should jointly inspect insulated steel sleepers, every six month for checking the effectiveness of insulation in track circuited areas. SSE/SE/S&T should coordinate this.