Update On CTH. AP (Midway Rd.) & LP. Calumet County Highway Department July 15, 2008. 2008 PROGRESS CTH. LP THROUGH JULY 15 TH. ALL UNDERGROUND WATER, SANITARY & STORM SEWER HAS BEEN INSTALLED AND TESTED ON CTH. LP FROM CTH. AP ROUND-A-BOUT, SOUTH TO WHERE NEW MIDWAY ROAD IS ALIGNED.

cody-byers
Télécharger la présentation

Update On CTH. AP (Midway Rd.) & LP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update On CTH. AP (Midway Rd.) & LP Calumet County Highway Department July 15, 2008

  2. 2008 PROGRESS CTH. LP THROUGH JULY 15TH • ALL UNDERGROUND WATER, SANITARY & STORM SEWER HAS BEEN INSTALLED AND TESTED ON CTH. LP FROM CTH. AP ROUND-A-BOUT, SOUTH TO WHERE NEW MIDWAY ROAD IS ALIGNED. • ASPHALT RESTORATION HAS TAKEN PLACE AND THE ROAD IS OPEN TO TRAFFIC. • ANTICIPATED COUNTY FUNDS = $ 52,383.00

  3. 2008 PROGRESS CTH. AP/MIDWAY RD. THROUGH JULY 15TH • ALL UNDERGROUND WATER, SANITARY & STORM SEWER HAS BEEN INSTALLED AND TESTED ON THE NEW PORTION OF ROADWAY FROM HUCKLEBERRY LN. EAST TO CTH. LP. • VEGETATIVE RESTORATION WILL TAKE PLACE AS SOON AS WEATHER PERMITS. • ANTICIPATED COUNTY FUNDING APPLIED TO THIS PORTION IS $ 32,541.00

  4. 2008 PROGRESS CTH. AP/MIDWAY …CONT’D: • UNDERGROUND WATER, SANITARY & STORM SEWER FROM CTH. LP WEST TO EISENHOWER DRIVE WILL BE COMPLETED IN FALL OF 2008 AS SOON AS ALL AQUISITION OF PROPERTY IS OBTAINED. APPROXIMATE COUNTY FUNDING IS $ 63,168.00 • ROADWAY ALIGNMENT OF MIDWAY NEEDS TO BE SHIFTED SLIGHTLY NORTH DUE TO WETLANDS THAT WERE DISCOVERED DURING THE WETLAND DELINIATION PROCESS THAT WAS PERFORMED BY THE CITY’S CONSULTANT ON THE PROJECT. 3 PARCELS WERE AFFECTED BY THE CHANGE. • COUNTY FUNDING OF LAND ACQUISITION ON PROJECT FROM HUCKLEBERRY TO EISENHOWER ESTIMATED AT APPROXIMATELY $ 355,000.00.

  5. MIDWAYRD. WEST OF LP

  6. MIDWAY RD. EAST OF CTH.LP

  7. MIDWAY EAST OF CTH. AP

  8. MIDWAY EAST

  9. MIDWAY EAST OF CTH. LP

  10. LOOKING TOWARDS 2009 CTH. LP FROM CTH. AP ROUND-A-BOUT SOUTH TO NEW MIDWAY ROUND-A-BOUT: • GRADE, GRAVEL & ASPHALT PLACEMENT • COUNTY HIGHWAY DEPARTMENT ANTICIPATES PARTNERING WITH OUTAGAMIE COUNTY HIGHWAY ON THE CONSTRUCTION

  11. 2009 CONTINUED • NEW MIDWAY RD. AT INTERSECTION WITH CTH. AP CONCRETE ROUND-A-BOUT INSTALLATION • NEW MIDWAY RD. AT INTERSECTION WITH CTH. LP CONCRETE ROUND-A-BOUT INSTALLATION • COUNTY FUNDING ESTIMATED AT APPROXIMATELY $ 425,500.00

  12. 2009 CONTNUED • GRADE, GRAVEL & ASPHALT ON ENTIRE PORTION OF NEW MIDWAY AND CTH. LP FROM CTH. AP TO NEW MIDWAY. • COUNTY FUNDING APPROXIMATELY $ 491,400.00

  13. LOOKING TOWARDS 2010 CTH. LP • CTH. LP FROM ROUND-A-BOUT SOUTH TO MIDWAY RD. ROUND-A-BOUT TOP LAYER OF ASPHALT APPLIED BY COUNTY HIGHWAY DEPARTMENT.

  14. LOOKING TOWARDS 2010 CTH. AP/MIDWAY RD.: • NEW MIDWAY ROAD ALIGNMENT TOP LAYER OF ASPHALT APPLIED FROM HUCKLEBERRY LN. TO EISENHOWER DRIVE APPLIED BY CALUMET COUNTY HIGHWAY DEPARTMENT.

  15. 2010 CONTINUED: • CTH. AP/MIDWAY ROAD ASPHALT REMOVED AND CONCRETE APPLIED FROM KERNAN TO HUCKLEBERRY LN. • COUNTY FUNDING APPROXIMATELY $ 425,000.00

  16. PROJECT SUMMARY • CALUMET COUNTY IS CONTINUING TO WORK WITH THE CITY OF APPLETON TO DEVELOP AN INTERGOVERNMENTAL AGREEMENT REGARDING THE PROJECTS. ALL FUNDING LISTED FOR 2009-2010 IS APPROXIMATE BASED ON PROJECTED FIGURES.