TPC meeting at Bangalore Sat. 11 March 2006, 14h-15h. Outline of my talk at tracking session Discuss how to organize the workpackages Get ideas as to how to update the LC-TPC organization. Discuss upcoming PRC meeting Madhu kindly agreed to draft minutes of the meeting.

codyc
Télécharger la présentation

TPC meeting at Bangalore Sat. 11 March 2006, 14h-15h

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TPC meeting at BangaloreSat. 11 March 2006, 14h-15h • Outline of my talk at tracking session • Discuss how to organize the workpackages • Get ideas as to how to update the LC-TPC organization. • Discuss upcoming PRC meeting • Madhu kindly agreed to draft minutes of the meeting Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

  2. “To-do” list for next few weeks/months • Detector Outline Documents (LDC and GLD) • LP planning • Detector Workshops (Instrumentation@Slac and TPC Applications@LBNL) 3-8April2006 • Status report to the Desy PRC 11May2006 (written version due four weeks earlier) • Organization of the LC TPC collaboration Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

  3. Outline of my talk on Monday in tracking@Bangalore Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

  4. R&D issues for the LC-TPC design and their feedback to the Large Prototype • OUTLINE of TALK • Overview • Motivation, LC-TPC R&D Status • Next step: Build the Large Prototype (LP) • The LC TPC design issues • LC-TPC/LP Work Packages Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

  5. TPC R&D Groups Europe RWTH Aachen CERN DESY U Hamburg U Freiburg U Karlsruhe UMM Krakow Lund MPI-Munich NIKHEF BINP Novosibirsk LAL Orsay IPN Orsay U Rostock CEA Saclay PNPI StPetersburg U Siegen America Carleton U Cornell/Purdue Indiana U LBNL MIT U Montreal U Victoria Yale Asia Tsinghua U XCDC: Hiroshima U Minadamo SU-IIT Kinki U U Osaka Saga U Tokyo UAT U Tokyo Kogakuin U Tokyo KEK Tsukuba U Tsukuba Other MIT (LCRD) Temple/Wayne State (UCLC) …Other groups interested? NB: Started as subset of these groups working together reporting to the DESY PRC; it has recently been expanding… Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

  6. R&D Planning • 1) Demonstration phase • Continue work with small prototypes on mapping out parameter space, understanding resolution, etc, to prove feasibility of an MPGD TPC. For CMOS/Si-based ideas this will include a basic proof-of-principle. • 2) Consolidation phase • Build and operate the LP, large prototype, (Ø ≥ 75cm, drift ≥ 100cm), with EUDET infrastructure as pedestal, to test manufacturing techniques for MPGD endplates, fieldcage and electronics. Design is starting---building and testing will take another ~ 3 years. • 3) Design phase • After phase 2, the decision as to which endplate technology to use for the LC TPC would be taken and final design started. Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

  7. What are we doing in Phase 1 ? Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

  8. Phase 2 • Basic Idea: LP should be a prototype for the LC TPC design and test as many of the issues as possible as was done before, e.g., TPC90 @ Aleph • The Eudet infrastructure gives us a starting basis for the LP work • There other LC TPC R&D issues in addition to building LP which will be planned in conjunction with it Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

  9. Work Packages for the LP and related work on the LC TPC0) Workpackage: TPC R&D programme A job for LC TPC collaboration to define EXAMPLES (see talk for all of the workpackages) Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

  10. Work Packages for the LP and related work on the LC TPC2) Workpackage ELECTRONICS(for LP and for LC TPC)Groups expressing interest to date(others?) a)"Standard" RO/DAQ for LP: Aachen, Desy/HH, Cern, Lund, Rostock, Montreal, Tsinghua, +contribution from Eudet b) CMOS RO electronics: Freiburg, Cern, Nikhef, Saclay, +contribution from Eudet c) Electr.,powerswitching,cooling Aachen, Desy/HH, Cern, Lund, for LC TPC: Rostock, Montreal, St.Petersburg, Tsinghua, +contribution from Eudet Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

  11. Review of LC TPC design issues • List of LCTPC/LP Workpackages • End of talk… Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

  12. Had phone meeting last Thursday to start • At today’s meeting, let’s continue the discussion to try to understand how to organize this LCTPC/LP work Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

  13. LCTPC/LP Workpackages • We have the conveners. Some ideas: • -A first meeting at LBL applications WS to set up: • -“Kickoff” design meeting? • -Conveners get feedback from LCTPC collaboration, then • -Have regular phone meetings • -Less frequent full meetings • -What else? Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

  14. LCTPC collaboration • We had for the PRC reports: • -Steering group with 1 representative and 1 backup per country: discuss overall situation, make recommendations • -Regular R&D phone/video meetings set up by me • -Madhu did minutes • -Paul kept track of TPC talks at conferences/workshops • -Some other responsibilites were distributed • What do we need for the enlarged TPC collaboration and Phase (2)? • A suggestion (others are welcome) after some discussion: • -Extend the steering to Japan, China, others to cover all countries, keeping the present setup for the steering. (That’s the easiest way for a first iteration. We can make further changes as we go.) • -Invite the group leaders to join the steering meetings if they wish. Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

  15. Upcoming PRC Meeting • Status report to the Desy PRC 11May2006 (written version due four weeks earlier) • Written version: “what’s happened since last PRC” • Start on draft now, put final touch-ups the week of April 10. Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning