An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ang TideRight Vessel for ComplexDiving Operations

  2. Right Vessel - Right Time • Configured for Multi-Purpose Diving Ops • Close In Around the Clock Platform Operations • Submarine Cable Installation • Cable Lay Survey & Monitoring • Riser Assembly & Construction • Trenching Operations • Diver Hand Held Trenching Capability • Deep Power Trenching • ROV Operations • Mini-Survey Operations • Cable Lay In Trench Assessment

  3. No Off Shore Complex too Tight • Superb DP2 Positioning • Diving Operation, In, Under & Over • 24 Hr Operations • 26 Divers on Multiple Shifts • Three Decompression Chambers • 12 Helium Bottle Assembly • 12 Oxygen Bottle Assembly

  4. Trenching / Mat Laying Operations • Monitor Cable • Pipe Line Depth • Pipe Line Crossings • Bottom Mat Lay Downs • Cable Uroduct Application • Top Mat Lay Downs

  5. Extreme In Close Support Close In Positioning Allowing Diving Operation Penetration Any Where a Diver Needs to Go

  6. Submarine Cable OperationsPower & Fiber Optics Extensive Experience in: Submarine Cable Laying Riser Construction Platform Termination Complex Infrastructure Pipe Crossing Protection Mat Positioning & Uroduct Protection

  7. And Occasional Toast

  8. Pattarozzi Tide Dp Work Horse