An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New Mississippi River Bridge EWGCOG PresentationJanuary 8, 2007

  2. Original MRB Project Components Relocated I-70 (Including new river bridge, Missouri interchange and new alignment in Illinois) Relocated IL 3 I-64 Connector Tri-Level Interchange Reconstruction (I-55/64/70 Interchange in East St. Louis) Reconstruction of Poplar Street Bridge Approaches

  3. Re-Evaluated MRB Project Components Relocated I-70 (Including new river bridge, Missouri interchange and new alignment in Illinois)

  4. Relocated I-70 Overall Plan

  5. Illinois/Missouri Cost Breakdown *Assuming construction starts in Spring 2007 and is completed by 2013

  6. Illinois/Missouri Cost Breakdown $910* million Relocated I-70 Project Cost - $239 million Federal Funds $671 million shortfall for Relocated 70 Project IL portion - $361 million MO portion - $310 million *Assuming construction starts in Spring 2007 and is completed by 2013

  7. Affordable Alternative • Need an affordable solution • One that increases interstate capacity in the downtown area • And can be built within the same timeframe as Relocated I-70

  8. Martin Luther King Bridge Coupler CONCEPTUAL Martin Luther King Bridge Coupler Overall View

  9. Martin Luther King Bridge Coupler (MO Approach) Martin Luther King Bridge Coupler MO Approach Details

  10. Martin Luther King Bridge Coupler • Based on a conceptual review and an assumed start date of 2011, the cost estimate is $410 million to $450 million • New 4-12’ lane parallel bridge • Provide 3-12’ lanes on existing MLK Bridge • Direct ramps to existing I-70 in MO • Direct ramps to existing I-55/70 near M.L. King Drive in East St. Louis

  11. Martin Luther King Bridge Coupler - Advantages • Could be completed in the same timeframe as Relocated I-70 • No tolls • Removes I-70 from the Poplar Street Bridge • Expected to redistribute regional traffic and improve access to downtown St. Louis • New 4-lane bridge

  12. Martin Luther King Bridge Coupler – Funding Sources $410 to $450 million *Total Cost $164 million Federal T-bill (IL) $ 75 million Federal T-bill (MO) $ 50 million State of Missouri $121 to $161 million State of Illinois *Assuming construction starts in 2011

  13. Why This Alternative Now? • The original Mississippi River Bridge project is a comprehensive, regional improvement. If unaffordable, T-bill funding is in jeopardy . • The Martin Luther King Bridge Coupler is an affordable alternative to be considered.

  14. Next Steps • Coordinate support of FHWA, MoDOT, City of St. Louis, E. St. Louis and other local agencies • Begin the Environmental Impact Statement process

  15. Illinois MRB Project Funding Included in the District 8 portion of the FY 2007-2012 Proposed Highway Improvement Program are the following projects for the MRB project. This funding is a combination of federal and state funds. *Contingent funding refers to the need for additional federal funds in order to complete these portions of the project.

  16. Illinois MRB Project Funding Included in the District 8 portion of the FY 2007-2012 Proposed Highway Improvement Program are the following projects for the MRB project. This funding is a combination of federal and state funds. *Contingent funding refers to the need for additional federal funds in order to complete these portions of the project.

  17. Illinois MRB Project Funding • District 8 has $924 million out of $10.4 billion of projects listed in IDOT’s FY 2007-2012 Proposed Highway Improvement Program. • These projects are funded using a combination of state and federal funds. • Revenue streams can be any one or combination of the following items: • Illinois motor fuel tax, Illinois motor vehicle registration, Illinois special capital funds and federal discretionary or formula funds.

  18. Federal MRB Project Funding • Listed below is a brief description of each SAFETEA-LU earmark for the MRB Project. • SAFETEA-LU Legislation for Illinois: • National & Regional Significant funds $150 mil • #10 Mississippi River Bridge and related roads • Transportation Improvements funds $ 14 mil • #145 Construct new Mississippi River Bridge and related roads in the vicinity of East St. Louis • SAFETEA-LU Legislation for Missouri: • Highway Bridge Program funds $ 50 mil total (= 12.5 mil per year for 4 years) • (iv) to the State of Missouri for construction of a structure over the Mississippi River to connect the City of St. Louis, Missouri to the State of Illinois • Transportation Improvements funds $ 25 mil • #211 Mississippi River Bridge St. Louis, Missouri

  19. QUESTIONS?