ETHEKWINI TRANSPORT AUTHORITY FEEDER SERVICES IN SUPPORT OF N-S RAIL CORRIDOR 27 June 2008

ETHEKWINI TRANSPORT AUTHORITY FEEDER SERVICES IN SUPPORT OF N-S RAIL CORRIDOR 27 June 2008. Rail as Backbone of N-S Transport Corridor Success Factors – Rail as Preferred Choice. 1. Image and Performance Standard of Fleet Fleet Maintenance Standards of Stations Safety and Security

coye
Télécharger la présentation

ETHEKWINI TRANSPORT AUTHORITY FEEDER SERVICES IN SUPPORT OF N-S RAIL CORRIDOR 27 June 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ETHEKWINI TRANSPORT AUTHORITY FEEDER SERVICES IN SUPPORT OF N-S RAIL CORRIDOR 27 June 2008

  2. Rail as Backbone of N-S Transport CorridorSuccess Factors – Rail as Preferred Choice 1. Image and Performance • Standard of Fleet • Fleet Maintenance • Standards of Stations • Safety and Security • Improved Coverage / Targeted O-D’s • Convenient, frequent feeder services • Convenient, quick transfers • Cost Competitive • Equivalent cost or cheaper • Removal of Direct Competition • Effective Marketing Strategy • Focussed Investment (Future not Past)

  3. Future N-S Rail ServiceID of Feeder Service Areas • TARGETED O-D’s • Easily accessible to rail (with or without feeders) • Service efficient (perceived and actual) • Cost efficient (competitive or lower trip fares) • IMPLICATIONS • Natural catchment areas for feeders (not a forced fit) • Feeder trip distance / time significantly less than rail component of journey • Transfer rail stations : easy feeder access / convenient pass transfer

  4. Potential Feeder Services in Support of N-S Rail N2 Bridge City Tembalihle KwaMashu N3 Durban CBD Harbor Rossburgh Montclair Umlazi Merebank Reunion KwaMnyandu Isipingo N2 KwaMakutha

  5. Staging Programme -Feeder Services to N-S Rail • 2010 • CBD Distribution System (Phase 1) • Pilot service to KwaMnyandu (Umlazi) • Temporary service to KM and/or Thembalihle stations (INK) • Temporary service to Reunion, Merebank, Montclair, Rossburgh •  Promote transfers from existing PT services terminating in Isipingo • POST 2010 • CBD PT Distribution System (Phase 2 – post 2015) • Final system(s) for Umlazi line • Bridge City feeder • Restructured permanent feeders to KM line • Restructured permanent feeders to Isipingo, Reunion, Merebank, Montclair

  6. Feeder Taxi OperationTypical Cost Structure Assumes use of 18 seaters – Diesel Fuel Cost R11.30 / litre Variable Cost Fuel R 1.58 / km Other R 0.60 / km R 2.18 / km Fixed Cost R94 000 / veh / year Assumes: Profit included in cost structure Recapitalisation of vehicle – 5 years

  7. Typical Feeder Taxi to Rail Service Umlazi Line - from KwaMnyandu Station Umlazi Reunion 4 KwaMnyandu 3 2 1

  8. Typical Feeder Taxi to Rail Service Serving INK Area from Bridge City: (Post 2010 Operation) 1 2 7 3 6 Bridge City 5 4 Tembalihle KM Adapted from Feeder Route System from GOBA Consulting

  9. Taxi Feeder Services to RailIndicative Service and Cost Summary

  10. Rail Service for 2010 • Use as opportunity to promote a successful transition programme for moving road-based PT users onto rail:- • Quality • Convenience • Security • Cost • Consider fare structure as promotion opportunity during WC 2010