An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “It is our responsibility to keep pace with innovative educational developments and to inspire lifelong learning with the use of technology.” – Dean Lonnie H. Norris

  2. Opened Sept. 2000 • ADEC Equipment • 76 Stations • Instructor Station • Kilgore Mask & Typodont • Stagefront Presentations’ Technology

  3. ADEC Customization: Headrest, Call Light, Back to Back Design and Maintenance Access Panel ADEC Partnership w/ Stagefront Presentations Systems Visit Other Schools Evaluated On-Site Units Design to Space Available Selection

  4. Unused Attic Space Added to Cost Faster Implementation Managed by Pre-Clin Faculty Maintained Existing Bench Lab Security Issues Need to Protect Investment Construction Weekly Meeting (18 Months) All Stakeholders Facilities

  5. Construction • Weekly Meetings • Facilities, Faculty, Vendors, Security, Purchasing, Fire Marshall, Engineers, Architect, Telecom, School Administration • Coordinate Construction Impact on Rest of School • Utilities Shutdown • Elevator Interruption • Noise Levels

  6. Initial Costs • Construction • Equipment • Telecomm • 3.4 Million • School Reserves • Fundraising • Deferred Maintenance

  7. Ongoing Costs • Equipment Maintenance/Repairs • Masks • Staff Time • Additional Features • Curing Lights • Overhead Cost for Cleaning • Computer and Audio/Visual Upgrades • Utilities • No Additional Student Fees

  8. Curricular Changes • Monitor at Each Station • Case Based • Used in Continuing Education at Yankee Dental Congress • Schedule Change • Enthusiastic Student Response • Expand to Other Areas • Radiology

  9. Lessons Learned “More is Better” • Involvement • Planning • Communication “Feels like the real thing” “Going to class is so much fun!”