1 / 2

General using symmetries in CST (Andrea), presented at the last impedance meeting .

Impedance working group update 3rd Sept 2013. General using symmetries in CST (Andrea), presented at the last impedance meeting . Transverse impedance of finite length devices with mode matching (Nicolo), and recall of Zotter / Gluckstern (Elias) presented at the last impedance meeting

cruz
Télécharger la présentation

General using symmetries in CST (Andrea), presented at the last impedance meeting .

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Impedance working group update 3rd Sept 2013 • General • using symmetries in CST (Andrea), presented at the last impedance meeting. • Transverse impedance of finite length devices with mode matching (Nicolo), and recall of Zotter/Gluckstern (Elias) presented at the last impedance meeting • CST specialized training coming up. • HL-LHC • Deadline: Beam induced heating with HL-LHC parameters for end of Summer • Deadline: impedance model for November

  2. LHC • ALFA: request to increase the gap between the bellow and the filler from 1 mm to 2 mm. • ALFA recommendation out for comments (Olav) • Non-conformities in RF contacts (presented at the last impedance meeting, LBOC next week): impedance of damage seems to be small and damage has not evolved from 2009 in the trplets no strong push to repair if isolated as difficult operation. • TDI: trying to increase copper coating thickness, but possibility of peeling in case of beam impact. • SPS • Wirescanner: MSWG last week most likely the insert tube will be removed. • ZS: discussion with Bruno Balhan, the ZS in LSS2 will not be changed, maybe ZSTF in LSS6, but not much time left. • TPSN, TPSG  very similar geometry to dummy septum without screen  likely many modes at low frequency. Serena agreed to study this. • PS • Deadline: Simone’s correction for TDR are being implemented. • Maybe new BGI in PS (Mariusz Sapinski): will contact us. • PSB • No news. • CLIC • No news • ELENA: • No news • TLEP: • No news

More Related