1 / 10

South Halls: Ewing-Cross Renovation

South Halls: Ewing-Cross Renovation. AE Senior Thesis: Tech. 1 Quaid Spearing CM Option September 16, 2013. Client Information. University Park is home to ~44,000 students, of which 13,700 live on campus Why Renovate? Deterioration of current MEP systems

cuellara
Télécharger la présentation

South Halls: Ewing-Cross Renovation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. South Halls: Ewing-Cross Renovation AE Senior Thesis: Tech. 1 Quaid Spearing CM Option September 16, 2013

  2. Client Information • University Park is home to ~44,000 students, of which 13,700 live on campus • Why Renovate? • Deterioration of current MEP systems • Not compliant with current building/ADA codes • Sorority relocation • Project Expectations • #1 Priority = Safety • Meet Project Schedule • 50 Year Decisions

  3. Existing Conditions State College: Google Maps Vicinity Map: Google Maps Existing Conditions: Quaid Spearing

  4. Building Systems Summary Structure Demolition • Asbestos Abatement: ceiling mastic, floor tiles, insulation • MEP systems, bathroom slabs, interior/exterior walls Masonry North Walkway Slab Bathroom Slab Stone Panel Projection South Brick Façade East Wall Section Photos by Quaid Spearing

  5. Building Systems Summary • Mechanical • System Types: Campus steam & Chilled Water, underground utilities • Distribution Types: Dual pipe system, four pipe system, Air-to-Air ERV • Fire Suppression: Wet pipe, with attic on dry pipe • Electrical • Excavation • Earth formed footings • no dewatering required • Curtain Wall MDP LDP Panel boards Elevators Emergency XFRMR Curtain Wall North/South Quaid Spearing Power Riser Diagram: Quaid Spearing

  6. Project Delivery System

  7. Staffing Plan

  8. Table 1: RS Means Square Foot Estimate Project Cost Evaluation Significant System Costs • Mechanical & Plumbing • Electrical • Drywall & Ceilings Table 2: Building Cost Summary Comparison Key Differences • Existing Structure • Roofing • Low floor heights

  9. Project Schedule Summary

  10. Questions???

More Related