1 / 9

Liaison activities with other organisations (GHG/07/46)

Liaison activities with other organisations (GHG/07/46). EPRI CCS-CDM working group CSLF Financing CCS (joint IEA GHG – IEA CCC) Det Norske Veritas (DNV) EU – CCS Guidelines. Assessment Criteria – EPRI.

Télécharger la présentation

Liaison activities with other organisations (GHG/07/46)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Liaison activities with other organisations(GHG/07/46) • EPRI • CCS-CDM working group • CSLF • Financing CCS (joint IEA GHG – IEA CCC) • Det Norske Veritas (DNV) • EU – CCS Guidelines

  2. Assessment Criteria – EPRI • IEA GHG uses standard technical and economic assessment criteria in its studies on CO2 capture • IEA GHG and EPRI will produce updated criteria • Taking account of EPRI’s experience from their Technical Assessment Guide (TAG) • Expanded to include other significant criteria • Provide sets of criteria for plants in other countries • EPRI has prepared a first draft of the Design and Estimating Basis • A workshop will be held to discuss this, possibly in early December, • IEA GHG Members are invited to participate; some members indicated interest already.

  3. CCS- CDM working group • 3 workshops held. • 3rd workshop considered key CCS-CDM issues raised at last COP-MOP (2). • Group circulated headline conclusions for consideration by those making submissions to COP-MOP 3 in Bali, in December. • The submissions received have not yet been posted on the UNFCC website. • SBSTA 27 will discuss in Bali 3-11th December.

  4. Carbon Sequestration Leadership Forum • Agreement reached between IEA GHG and CSLF Technical Group • Details in Annex 1 of members papers • Includes representation by CSLF at ExCo • Currently through existing membership • IEA GHG representation at CSLF • John Gale nominated representative • Two way process to feed through ideas • Where work is performed jointly, due reference will be given to all parties • Action • Members invited to endorse co-operation between CSLF Technical Group and IEA GHG

  5. Financing CCS Developments • Joint IEA GHG – IEA CCC activity. • 1st meeting was in summer of 2007. • Successfully involved the financial community • 2nd Financing CCS meeting: • New Yorker Hotel, New York, 28-29th May 2008 • 1st agreed Sponsor is World Coal Institute (WCI) • Other Sponsors Invited

  6. DNV • Study on guidelines on site characterisation approved at 31st ExCo • At time IEA GHG had identified a number of groups working in same area one of which was DNV • DNV are a non profit organisation in Norway • Accredited verifier under UNFCCC • Standards body for off shore oil and gas industry • DNV has proposed a joint venture project supported by Gassnova to develop and qualify sites for geological storage

  7. DNV • Sites will include oil and gas fields and deep saline aquifers • Methodology will be included in a Recommended Practise document • Incorporate; site selection, monitoring, risk assessment, remediation etc. • Aimed at project developers, regulators and planners • a Phase 1 project to develop a preliminary version of the RP will end in December 2007

  8. DNV • IEA GHG propose to join Phase 2 of the project that will start in January 2007 • Develop a full RP • Draft available before SBSTA meeting in May • DNV work plan is compatible with IEA GHG aims for study • Slightly broader • IEA GHG believes it is more credible to work with an organisation like DNV than to develop guidelines on its own • Avoids duplication of effort • Work closely with a member organisation i.e. Gassnova • Get financial leverage by contributing to a larger project.

  9. European Union – CCS Guidelines • EU established (2005) European Technology Platform for Zero Emission Power Plants (ZEP) • 10 to 12 demonstrations to be put in operation (target by 2015) • EU recognises state aid will be necessary • New guidelines for State Aid for Environmental Protection must provide a clear long-term framework for how state aid to CCS projects can be approved.

More Related