An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Budget Status and FY04 Requests Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003

  2. GlueX Budget Proposal for FY03 • Cardman suggests that we develop a budget proposal assuming a timely approval of CD-0 and • Alternate strategy if approvals are delayed

  3. Contract Status • FIU: Contract awarded • JLab to purchase VLPC cassettes from Fermi • UConn: Computer equipment ordered • Need iteration on drawings of active collimator • IUCF: extension of present work approved • IU: blanket order in place for electronics • DAQ/Dartmouth: contract finalized(?)

  4. Large ticket items • Solenoid CD-0 • Barrel calorimeter CD-0 • Civil CD-0 • Robotics facility purchased • Forward calorimeter CD-0 • Cerenkov R&D required • Tracking R&D required • Tagger design?

  5. We need clear definition of Front-end Signals (from Electronics Review)

  6. Suggestions from electronics review • Work on Front-ends • Tabulate specifications and requirements driven by the physics • Look at existing solutions (e.g. PHENIX, ATLAS, etc) • Prototype FE coupled with detector R&D. • To be developed are the vertex tracker, FDCs, CDCs (assuming barrel calorimeter finds an appropriate solution) • Conceptual design of entire system including cabling, grounding, etc. • Develop time distribution synchronization method • DAQ: parallel event builder, L3 farm

  7. Consider supporting personnel? • JLab • Cost sharing of post-doctoral positions

  8. Actions and prerequisites

  9. Discussion • Large budget items require CD-0, unless exceptions are made to move them forward • Any (small) R&D should certainly be supported by our budget allocation • Support for manpower may be an effective way of using some of our funds • This will usually imply commitments for future years

More Related