An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Feasibility Studies CSCI 5801: Software Engineering

  2. Feasibility Studies

  3. Feasibility Studies • Should we develop this system? • Does the system contribute to objectives of the customer? • Are there better and cheaper alternatives they have? • Will it work within the informational/ organizational structure of the organization? • Is the system affordable by the customer? • Product development • Supporting hardware/software • User training • Maintenance

  4. Feasibility Studies • Can we develop this system? • Do we have the resources? • People • Expertise/experience • Hardware/software resources • Can it be done within constraints? • On time • Within budget If not, can we afford to hire/purchase what we don’t have? With respect to customer needs

  5. Major Steps • Determine scope of product • Create basic design • Estimate costs • Deliver report/proposalfor decision • Must be done quickly (a week or two at most) Analogous to steps in development process!

  6. Project Scope • What will system do? • Short list of functions/use cases • Will refine in requirements stage • What will system not do? • Just as important to avoid misunderstanding! All possible requirements What this system will do

  7. Example: Registration System • This system will • Read courses from the existing course inventory • Allow chairs to create sections • Allow students to view course information, and add or drop courses over the web • Keep track of roster for sections and allow instructors to view their courses • Close sections when the roster is full • Prevent students from adding courses at conflicting times

  8. Example: Registration System • This system will not • Enforce prerequisite constraints • Detect room/instructor conflicts • Store grades received by students • Handle billing for courses

  9. Preliminary Design • Is there some way the system can be built? • Worry about “best” design later • Often based on existing design patterns Client/serverarchitecture Repository architecture registrars Central repository course inventory server faculty students

  10. Cost Estimation • Goal: accurate estimate of time/expense of developing system • Reality: Too many variables • Human, technical, market…

  11. Cost Estimation Models • Experience: • “How long has it taken us to do similar things before?” • If you haven’t done this before, assume a longer time! • Mathematical: • Example: COCOMO II (COnstructive COst Model) • Very widely used for cost estimation and project scheduling • http://sunset.usc.edu/research/COCOMOII/cocomo_main.html Function Complexity of problem Estimate of effort Expertise of team

  12. COCOMO II • Project complexity = NOP (new object points) • Based on number/complexity of • User interface screens (single process may have many) • Reports/database tables • Major components/classes used to implement logic

  13. COCOMO II • Individual Productivity Rate (PROD) based on • Developer general experience/capability • Experience with software engineering tools/environments

  14. COCOMO II • NOP also based on reuse (%reuse) • Similar components we have previously built • Components we can purchase “off shelf” • NOP = (object points) x (100 – reuse%)/100 • Estimated effort (in terms of person/months) =NOP/PROD

  15. Final Report • Describes all of the above • Project scope, Preliminary design, Cost estimate • May be presentation • To management for budget approval • To customer for approval/initial bids • May include simple prototyping • Sample screens for customer • Very simple system for user focus groups

  16. The Decision • Based on what is best for customers and your organization • Not other considerations • “It would look good on my resume if I said I have experience developing this type of system” • “I don’t know if it will work, but we have to be seen as having the most up to date stuff”

More Related