1 / 1

L ist of critical issues (update, from D. Schulte)

L ist of critical issues (update, from D. Schulte). 1 ) Concerning the RF structures:

damien
Télécharger la présentation

L ist of critical issues (update, from D. Schulte)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. List of critical issues (update, from D. Schulte) 1) Concerning the RF structures: • We had identified RF deflectors as critical. This refers to the combiner ring but should include the crab crossing cavities, which are not explicitly in the long list. I think the crab cavities should be added. • The kickers for the drive beam phase feedback could be either RF deflectors or other type of kickers. 2) In the feedback section one might want to explicitly mention the intra-pulse interaction point feedback. 3) The stray fields need to be reviewed consistently along the machine. Shielding may help but there are many points to be considered, e.g. the field induced by the pumps etc. CTC, 20080826

More Related