1 / 9

NEAREST MEETING April 1-3, 2009, Brest, France. BIROUK, M. KASMI, A. IBENBRAHIM, A. EL MOURAOUAH,

ROYAUME DU MAROC. المعهد الوطني للجيوفيزياء NATIONAL  INSTITUTE OF GEOPHYSICS (ING). MOROCCO SEISMIC NETWORK. NEAREST MEETING April 1-3, 2009, Brest, France. BIROUK, M. KASMI, A. IBENBRAHIM, A. EL MOURAOUAH, ING, CNRST, Morocco. Moroccan Seismic Network Upgrade 1st phase In progress :

dara
Télécharger la présentation

NEAREST MEETING April 1-3, 2009, Brest, France. BIROUK, M. KASMI, A. IBENBRAHIM, A. EL MOURAOUAH,

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ROYAUME DU MAROC المعهد الوطني للجيوفيزياء NATIONAL  INSTITUTE OF GEOPHYSICS (ING) MOROCCO SEISMIC NETWORK • NEAREST MEETING • April 1-3, 2009, Brest, France. • BIROUK, M. KASMI,A. IBENBRAHIM, A. EL MOURAOUAH, • ING, CNRST, Morocco.

  2. Moroccan Seismic Network Upgrade • 1st phase In progress : - 20 BB stations; - 11 SP stations; - VSAT facilities using 2 satellites & dual hub (seismic monitoring availibility even in case of one satellite faillure) - 6-8 stations linked simultaniuosely by VSAT & VPN for redundancy purpose - 8 stations equiped with STS-2 and Episensor - Data acquisition & processing system (antelope) • Second Phase: - 15 BB stations; - 10 SP stations; - 40 accelerographs; - 15 Portable digital seismographs

  3. Station distribution of the new telemetred seismic network (1st phase)

  4. Data Acquisition & Processing System DUAL HUB Dual Modem Antelope

  5. Moroccan Seismic Network Upgrade (Central recording System) • 2 workstations Sun Ultra 45 • 1 Raid System; • Dual Hub • NMS server; • 2 LCD screen 52’’

  6. New Station Installation

  7. New Station Installation

  8. Seismic data exchange • Last November, CNRST started the installation of new VSAT Seismic Network: • The Central acquisition system using Antelope software and Dual Hub VSAT System was installed, ; • 2 remote stations(1BB, 1SP) already installed and two other programmed for this month; • 2 BB stations in the north of Morocoo can be integrated to Nearest Nodes.

  9. Integration of tide gauge data : • CNRST has ordered and bought several months ago (June 2007), a real time digital tide gauge; • CNRST signed an agreement with Harbours management department (HMD) for the installation and operating of the tide gauge acquired by the CNRST and to upgrade of tide gauges owned by HMD for real time data communication; • Casablanca Harbour was chosen to host the new tide gauge and the installation is scheduled in 3 to 5 weeks. • .

More Related