1 / 1

PEO C4I and Space ACQUISITION PROGRAM STRUCTURE GUIDE

PEO C4I and SPACE MILESTONE B REVIEW TIMELINE. TIMELINE ~ 1 or More YEARS BETWEEN MILESTONE A and MILESTONE B. System Development and Demonstration. LONG-RANGE (PLANNING PHASE). DAB TIMELINE (ACAT ID & IAM). GLOSSARY ADM Acquisition Decision Memorandum

Télécharger la présentation

PEO C4I and Space ACQUISITION PROGRAM STRUCTURE GUIDE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PEO C4I and SPACE MILESTONE B REVIEW TIMELINE TIMELINE ~ 1 or More YEARS BETWEEN MILESTONE A and MILESTONE B • SystemDevelopment and Demonstration LONG-RANGE (PLANNING PHASE) DAB TIMELINE (ACAT ID & IAM) GLOSSARY ADM Acquisition Decision Memorandum CAIG Cost Analysis Improvement Group CARD Cost Analysis Requirements Description DABDefense Acquisition Board DOT&E Director of Operational Test & Evaluation DRMDAB Readiness Meeting DTSE&E Director, Test, Systems Engineering and Evaluation JRB JROC Review Board JROCJoint Requirements Oversight Council LCCE Life Cycle Cost Estimate RFP Request for Proposal OVERARCHING INTEGRATED PRODUCT TEAM (OIPT) MEETINGS Acquisition Strategy approval / RFP Release TEMP to DTSE& E / DOT&E CAIG Review of LCCE Final LCCE to CAIG DAB Readiness Meeting ADM CARD to CAIG JRB Review JROC Review OIPT Review DAB Draft LCCE to CAIG 7 DAYS 10 DAYS 2 DAYS 14 DAYS 14 DAYS 21 DAYS 3-4 WEEKS 30 DAYS 45 DAYS 180 DAYS EXIT CRITERIA FOR PHASE CR SATISFIED EXIT CRITERIA FOR PHASE A SATISFIED ADM NORMALLY APPROVES PROGRAM INITIATION PHASES MS A MS B LONG RANGE PLANNING PHASE PRE-REVIEW PHASE PLANNING PHASE NOTE: Milestone B is conducted to assess technology maturity and technical risk for entry into System Development and Demonstration. The DAB is required for ACAT ID & IAM. The preparations for the DAB need to start 180 days prior to the Milestone B review. ENCLOSURE (13) Page T-2 VERSION 3.0 FEB 2004 PEO C4I and Space ACQUISITION PROGRAM STRUCTURE GUIDE

More Related