An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SHORT TERM OPEN ACCESS

  2. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution system or associated facilities with such lines or system by any licensee or consumer or a person engaged in generation in accordance with the regulations specified by the Appropriate Commission”

  3. STOA CASE STUDY KAYAMKULAM CCGP, NTPC to PSEB 150 MW for 31 days on Round the Clock basis

  4. SR STOA OF KSEB(KYCPP) - PSEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 31 days PSEB NR CUSTOMER: NVVNL TRADER: NVVNL HVDC BACK TO BACK AT VINDHYACHAL IN WR INJECTING UTILITY KYCPP,KSEB DRAWEE UTILITY PSEB WR INTERVENING REGION WR HVDC BACK TO BACK AT BHADRWATHI IN WR • INTERVENING REGIONAL LINK • SR-WR • WR-NR INTERVENING STATE TRANSMISSION UTILITY KSEB KERALA CAPACITY APPROVED 150 MW DAILY PERIOD 0000-2400 HRS DATE OF COMMENCEMENT 01-05-06 DATE OF EXPIRY 31-05-06 KAYAMKULAM CCGT(NTPC)

  5. SR STOA OF KSEB(KYCPP) - PSEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 31 days PSEB NR EXPORT AT KYCPP BUS 150 MW HVDC BACK TO BACK AT VINDHYACHAL IN WR WR LOSSES IN KERALA 0.75% AT KERALA PERIPHERY 148.9 MW HVDC BACK TO BACK AT BHADRWATHI IN WR LOSSES IN SR 3.12% AT SR-WR PERIPHERY 144.3 MW LOSSES IN WR 4.0% KERALA AT WR-NR PERIPHERY 138.5 MW LOSSES IN NR 3.0% PSEB RECIEVES 134.4 MW KAYAMKULAM CCGT(NTPC)

  6. SR STOA OF KSEB(KYCPP) - PSEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 31 days PSEB APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION NR • SCHEDULING CHARGES PER DAY • Rs 3000 FOR SRLDC • Rs 3000 FOR WRLDC • Rs 3000 FOR NRLDC • Rs 1000 FOR KSEB HVDC BACK TO BACK AT VINDHYACHAL IN WR WR HVDC BACK TO BACK AT BHADRWATHI IN WR • TRANSMISSION CHARGES PER MW PER DAY • Rs 757.04 FOR CTU-SR • Rs 1114.72 FOR SR-WR LINK • Rs 345.1 FOR CTU-WR • Rs 560.09 FOR WR-NR LINK • Rs 521.37 FOR CTU-NR • Rs 672.07FOR KSEB TOTAL TRANSMISSION CHARGE PER UNIT 16.8/. Ps… KERALA KAYAMKULAM CCGT(NTPC) Details

  7. SHORT TERM OPEN ACCESS(STOA) RATES (2006-07) NORTHERN REGION 521.37 (2.2) 1335.50 (5.6) NORTH-EASTERN REGION NR-ER 560.09 (2.3) WR-NR ER-NER EASTERN REGION 557.96 (2.3) 441.24 (1.8) 407.87 (1.7) WR-ER WESTERN REGION 345.10 (1.4) WR-SR SR-ER 1114.72 (4.6) 1893.14 (7.9) SOUTHERN REGION Notes:i) The indicated STOA Rates are in Rs./MW/Day. ii) The figures shown in bracket correspond to the indicative STOA Rates in Paise/Unit. (approx.) 757.04 (3.2)

  8. UI vs STOA market (All regions) 100% power market 92% long term market 5% UI market 3% STOA market

  9. DETAILS OF REGION WISE STOA TRANSACTIONS IN 2005-06

  10. Constituent-wise STOA Import/Export Energy 2004 – 05 2005 – 06 All figures in MUs

  11. ESC TO EXIT