1 / 9

HIPPI 05

HIPPI 05. 2nd annual meeting. WP3: Superconducting RF structures. September 28-30, 2005 Cosener's House in Abingdon, Oxfordshire (UK),. Progress of the work : design. Cavity (RF & mechanical) multi-gap spoke (FZJ) elliptical (CEA)

delila
Télécharger la présentation

HIPPI 05

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HIPPI 05 2nd annual meeting WP3: Superconducting RF structures September 28-30, 2005 Cosener's House in Abingdon, Oxfordshire (UK), HIPPI05 meeting - September 28-30, 2005

  2. Progress of the work : design • Cavity (RF & mechanical) • multi-gap spoke (FZJ) • elliptical (CEA) • mechanical behaviour: mechanical modes, LFD (all participants) • improvement of the frame used for the cavity test (INFN & CEA) • Tuner • coaxial tuner (INFN) • coaxial tuner for CH cavity (IAP-FU) • preliminary design for elliptical cavity B (CEA) • Coupler • for multi-gap spoke (IPNO) • for elliptical cavity (CEA) HIPPI05 meeting - September 28-30, 2005

  3. Progress of the work : infrastructures Frankfurt University: New lab equipped for assembly and test of sc cavities New cleanroom New test stand for superconducting cavities HIPPI05 meeting - September 28-30, 2005

  4. Progress of the work : cavity tests Cool-down and 1st test sc 700 MHz spoke FZ- Juelich March 2005 Cool-down and 1st test sc 352 MHz spoke IPN- Orsay April 2005 Cool-down and 1st test sc CH cavity Frankfurt University July 2005 HIPPI05 meeting - September 28-30, 2005

  5. Interactions between participants • FZJ & IPN • design and test of multi-gap spoke with tuner and coupler • FZJ & CEA • preparation of the 700 MHz spoke cavity • INFN & CEA • cross check of LFD codes • improvement of frame (closer to “fixed-ends”) • IAP-FU & INFN (?) • coaxial tuner for CH cavities • LPSC & CEA • WP3 web site HIPPI05 meeting - September 28-30, 2005

  6. Milestones & Deliverables • Vertical test of cavity A • Delivered (01/2005) • Evaluation of 760 MHz spoke prototype • Delivered (05/2005) • Report on tuner for CH structures • To be delivered soon • Design report on 352 MHz n-gaps resonator • Delayed to next November • Report on evaluation of 352 MHz 2-gaps spoke res. • On time (10/2005) • Intermediate report on cavity A tuner • On time (12/2005) HIPPI05 meeting - September 28-30, 2005

  7. 3.2.7 Final mechanical design of resonator FZJ-IPNO 05 / 2005 06 / 2005 3.2.8 Integration of coupler. Tuning options FZJ-IPNO 07 / 2005 08 / 2005 3.2.9 Preparations for electron beam welding FZJ-IPNO 07 / 2005 03 / 2006 3.2.10 Manufacturing of 352 MHz n-gaps res. FZJ-IPNO 04 / 2006 09 / 2007 3.2.11 Evaluation of 352 MHz n-gaps res. FZJ-IPNO 10 / 2007 09 / 2008 Task schedule HIPPI05 meeting - September 28-30, 2005

  8. Communication WP3 web-site http://hippiwp3.in2p3.fr (Updated by ML Lombard from LPSC) WP3 meeting INFN-LASA, Milan 14-15 March, 2005 17 participants Next WP3 meeting Forschungszentrum Jülich HIPPI05 meeting - September 28-30, 2005

  9. Presentations HIPPI05 meeting - September 28-30, 2005

More Related