1 / 3

FY2008 plan ($75M ILC + $47M SCRF)

FY2008 plan ($75M ILC + $47M SCRF). ILC component R&D (~$37M) SCRF infrastructure (~$25M) Industrial SCRF procurement (~$22M Detector R&D (~$20M) Engineering design (~$12M) Site evaluation (~$4M) Management (~2M). DESY now $150M facility (EU accounting ).

delta
Télécharger la présentation

FY2008 plan ($75M ILC + $47M SCRF)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FY2008 plan ($75M ILC + $47M SCRF) • ILC component R&D (~$37M) • SCRF infrastructure (~$25M) • Industrial SCRF procurement (~$22M • Detector R&D (~$20M) • Engineering design (~$12M) • Site evaluation (~$4M) • Management (~2M) DESY now $150M facility (EU accounting) Over target puts US on trajectory for SCRF capability by 2010. FNAL now

  2. International discussions: FALC FALC oversees ILC, arranged GDE common fund. To do? review cost estimate; document ILC technological benefit; coordinate large world projects; formalize GDE engineering design stage; establish process for site selection. Canada Russia Europe S. Korea US DOE/NSF Japan China India This slide for Robin to discuss international discussions verbally

  3. Estimated Time Line Ref Design, cost, review Engineering design FALC proposal for site selection process Interim R&D oversight organization for GDE R&D Identification of site (or 2?) Key Final site specific TDR GDE Preconstruction planning ILC organization draft plan FALC Formal negotiation of ILC lab agreements Govts RDR cost LHC results Project start offramps

More Related