An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PETE 411Well Drilling Lesson 23Gas Cut Mud

  2. What is Gas Cut Mud? After drilling through a formation containing gas, this “drilled gas” will show up in the mud returns at the surface. Gas cut mud is mud containing some gas - from any source.

  3. Lesson 23 - Gas Cut Mud Effect of Drilling Rate Effect of Circulation Rate Mud/Gas Ratio at the bottom of the Hole Mud/Gas Ratio at the Surface Density of Gas Cut Mud Reduction of Bottom Hole Pressure due to Gas Cut Mud Safe Drilling Practices

  4. Read:Applied Drilling Engineering, Ch. 6 HW #12 –Csg. Design - due Nov. 1HW #13 –dc - Exponent - due Nov. 6

  5. How Critical is Gas Cut Mud? (1) Most people tend to overreact when gas reaches the surface. It is at this time one should be calm and determine where the gas units came from. Monitor the gas units response before reacting.

  6. How Critical is Gas Cut Mud? cont’d (2) It is true that gas at the surface will tend to cut the mud weight substantially. This cut can be as much as 5 to 7 PPG. But, it should be further realized that these cuts occur mainly in the top 200 feet of the hole with the worst cuts occurring in the top 50 feet. Therefore, the overall hydrostatic head is only reduced by a small margin.

  7. How Critical is Gas Cut Mud? cont’d Many times when large volumes of gas reach the surface the well will appear to be flowing. This is not necessarily due to a formation flowing or a kick, but may represent the extreme expansion of the gas near and at the surface.

  8. How Critical is Gas Cut Mud? cont’d (4) The following example problem gives an indication of the effect of reduction of mud weight at the surface on the reduction of hydrostatic head at the botton of the hole.

  9. How Critical is Gas Cut Mud? Example Problem Well depth = 15,000 ft Hole size = 7 7/8” Drill pipe size = 4 1/2” Mud weight = 15 ppg Drilling Rate = 20 ft/hr Circ. rate = 7.0 bbl/min

  10. How Critical is Gas Cut Mud? Formation Properties

  11. Bottom-Hole Ratio of Mud Volume to Gas Volume: This indicates there are 1990 volumes of mud to 1 volume of gas at the bottom of the hole.

  12. Ratio of surface volume of gas to bottom-hole volume of gas: (PV = ZnRT) This shows there are 465 volumes of gas at the surface per volume of gas at the bottom of the hole

  13. Mud/gas Volume Ratio at the Surface:

  14. Mud Density at the Surface: So the mud weight has been cut 2.84 ppg (from 15 to 12.16) ppg

  15. Mud Density at the Surface: It should be noted that in actual situations the mud cut would probably be less because we have assumed all gas stays in the mud-gas mixture. A certain amount of gas will break out. The effects of gas cut mud on the hydrostatic head:

  16. Hydrostatic Pressure and C

  17. Average T and Z

  18. Reduction in BHP

  19. Reduction in BHP This means the gas reduced the hydrostatic head by only 30.57 psi! The resulting bottom hole pressure will be p = 11,700 - 30.57 BHP = 11,669 psi

  20. Conclusion It can be seen that the surface gas cut of approx. 3 PPG resulted in a bottom hole pressure reduction of less than 31 psi. There is one other factor that reduces the effect of gas cut mud even further and that is the effect of drilled solids in the mud. Drilled solids will tend to raise the overall density of the mud.

  21. Drilled Cuttings Effect on Hydrostatic head:

  22. Drilled Cuttings Effect on Hydrostatic head: DBHP = 12 psi

  23. Drilled Cuttings Effect on Hydrostatic head: In this problem, the cuttings had very little effect on the hydrostatic head. But, if the rate of penetration were higher, the additional density added due to the drill solids could become significant.

  24. Summary of Gas-Cut Mud Problem At bottom: Gas expansion:

  25. Summary of Gas-Cut Mud Problem At surface: i.e. At the surface, the mud mix contains one part of gas (by volume) for each 4.279 parts of good mud.

  26. Summary of Gas-Cut Mud Problem Density of mix Density of Mud at surface = 12.16 #/gal (-2.84 lb/gal)

  27. Summary of Gas-Cut Mud Problem A reduction in the mud density at the surface by 2.84 lb/gal resulted in a reduction in BHP of:

  28. Note: It is very important in any drilling operation: To recognize the symptoms of increasing pore pressure To be able to estimate the magnitude of the pore pressure

  29. Note cont’d: To know the fracture gradients of the exposed formations To maintain the drilling practices within controllable limits To keep in mind that any one symptom of increasing pore pressure may not be sufficient to provide the basis for precise conclusions Look at all the indicators...

  30. ROP F.L.Temp DCl- rMUD Dt d Gas Units rSH YP

  31. What should be done when gas cut mud is encountered? (1) Establish if there is any fire hazard. If there is a fire hazard, divert flow through mud-gas separation facilities. (a) Notify any welder in area (b) Notify all rig personnel of the pending danger

  32. What should be done when gas cut mud is encountered? (2) Determine where the gas came from. If the casing seat fracture gradient is being approached, and there is some concern about raising the mud weight: Stop drilling and circulate, and observe the gas response. If source is drilled gas, the gas rate will decrease.

  33. What should be done when gas cut mud is encountered? (a) If the gas units completely return to the original background gas, it would probably be safe to resume drilling.

  34. What should be done when gas cut mud is encountered? (b) If there has been ample circulation time and the gas units do not drop back to the original background level, but stay at a higher value, this indicates that the mud weight is approaching the pore pressure and consideration should be given to increasing the mud weight.

  35. What should be done when gas cut mud is encountered? Establish Where did the gas come from? (a)Drilled gas - no increase in mud weight is required (b)Increasing pore pressure - (abnormal pore pressure) - May have to increase mud weight

  36. Drilling Techniques I. Balanced Drilling Balanced drilling by definition is when the hydrostatic head is equal to the pore pressure in the formation being drilled In the Gulf Coast area, if the hydrostatic head is 0 - 0.4 ppg over the actual pore pressure it is usually considered to be balanced drilling.

  37. Drilling Techniques - Balanced Drilling Advantages to balanced drilling conditions Optimizes the drilling rate Lithology changes can be detected immediately from the ROP curve Transition zones can be detected sooner

  38. Drilling Techniques - Balanced Drilling Disadvantages There is no room for error The wellbore must be carefully and continuously monitored for the first sign of formation pressure increase

  39. Drilling Techniques - Balanced Drilling Application of balanced drilling Balanced drilling is generally used for wildcat or exploratory drilling It is often used in hard rock formation drilling to optimize the rate of penetration

  40. Drilling Techniques II. Overbalanced drilling Overbalanced drilling by definition is when the pressure exerted by the hydrostatic head exceeds the formation pore pressure In the Gulf Coast region, if the mud weight is 0.4 ppg or more above the pore pressure, it is considered overbalanced drilling

  41. Drilling Techniques - Overbalanced Advantagesto drilling overbalanced Reduces the chance of swabbing a well in or taking a kick • Disadvantages • Overbalanced drilling reduces the rate of penetration substantially

  42. Drilling Techniques - Overbalanced Disadvantagesto drilling overbalanced - cont’d Drilling too far overbalanced can disguise lithology changes and transition zones Differential sticking can be caused by the excessive pressure differential between the mud hydrostatic and the pore pressure

  43. Drilling Technique - Overbalanced Application of overbalanced drilling This is most often used in areas of development drilling. In such areas, the pore pressures are generally known and the mud weights are maintained high enough to ensure ~never taking a kick or swabbing a well in. But, at the same time the mud weights are maintained low enough so as not to cause differential sticking

  44. Drilling Techniques - Underbalanced III. Underbalanced drilling Underbalanced drilling by definition is when the pressure exerted by the hydrostatic head of the mud is less than the pore pressure

  45. Drilling Techniques - Underbalanced Advantages of underbalanced drilling Increased rate of penetration Less formation damage due to mud filtrate or whole mud loss

  46. Drilling Techniques - Underbalanced Disadvantagesof underbalanced drilling Possible kicks Wells can be swabbed in more readily Wellbore formation cave-ins (wellbore stability)

  47. Drilling Techniques - Underbalanced Applicationof underbalanced drilling Underbalanced drilling is applied in areas that are very hard to drill such as some areas in West Texas. This is done to increase the rate of penetration. Note that this technique is used in areas that have very tight and competent formations. The tight formationsreduce the chance of taking a kick...

  48. Drilling Techniques - Underbalanced • Competent formations have less tendency to slough or cave-in to the wellbore due to the absence of a sufficient hydrostatic head to hold it back. • Horizontal wells in the Austin Chalk Application of underbalanced drilling cont’d

  49. Drilling Techniques - Controlled IV. Controlled Drilling Controlled drilling, by definition, is when a constant rate of penetration is maintained by fluctuating the weight on bit