1 / 15

Steps to Develop and Analyze VISTAS Control Strategies

Steps to Develop and Analyze VISTAS Control Strategies. Brock Nicholson Air Directors Meeting Charleston, SC November 15, 2005. Presentation. Process for remainder of 2005 Prescribed fire sensitivity proposed by USFS Sensitivity to represent BART Sensitivities for non-CAIR states.

derek-hood
Télécharger la présentation

Steps to Develop and Analyze VISTAS Control Strategies

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Steps to Develop and Analyze VISTAS Control Strategies Brock Nicholson Air Directors Meeting Charleston, SC November 15, 2005

  2. Presentation • Process for remainder of 2005 • Prescribed fire sensitivity proposed by USFS • Sensitivity to represent BART • Sensitivities for non-CAIR states

  3. Process for Remainder of 2005 • Identify BART-eligible sources for control • Sources within entire VISTAS domain, not just Class I geographic areas • Determine possible controls for evaluating reasonable progress • Use geographic area analyses • 200km boundaries • Trajectory, residence plots • Other?

  4. Process for Remainder of 2005 • Finalize control technology spreadsheets originally distributed in early 2005 • Determine available control options for source types • Apply constraints as submitted by stakeholders during review • Generate “first cut” incremental benefit emissions inventory

  5. Process for Remainder of 2005 • When appropriate, generate new SMOKE/CMAQ runs based on controlled inventory

  6. Prescribed Fire Sensitivity • USFS provided future year planned burns by acres and National Forest • Based on forest and smoke management plans • In contrast to existing modeling setup of constant fires in base year and future years

  7. National Forest Lands

  8. Prescribed Fire Sensitivity • Need to generate spatial data necessary to model new fires • Shape files provided with National Forest land coverage • Assume fire to occur within boundaries of NF forested land

  9. Prescribed Fire Sensitivity • Need to generate temporal data necessary to model new fires • Working with CART analysis and other meteorological data to define “best days” for Rx burn • USFS generally burns when conditions are optimal for elevated plumes

  10. Prescribed Fire Sensitivity • Originally no additional requested participation from non-USFS agencies

  11. BART Sensitivity • Using emissions inventory, identify sources eligible for BART reduction • Apply control technologies as identified in earlier process – lowest level reduction of SO2 and NOx for conservative benefit analysis • Quantify emission reduction by pollutant and grid cell within domain • Modify BaseF CMAQ file to account for these reductions • States review proposed controls before run is completed

  12. BART Sensitivity • For EGU’s, propose that CAIR = BART, so no additional controls • Do not apply controls for non-EGU’s with Q/d <10, where Q = SO2 + NOx • Run BART controls through SMOKE/CMAQ for episodes or 2002 annual to determine if CAIR + BART sufficient for uniform reasonable progress

  13. Sensitivities for non-CAIR States • CAIR levels as % reduction in NOx/SO2 • All non-CAIR States at once • State-by-State

  14. Additional Sensitivities • VISTAS States • Sources not controlled under CAIR/BART/etc. • Non-NOx/SO2 strategies • Offshore marine • Other sources • > 200km • outside areas of initial interest

  15. Additional Sensitivities • Non-VISTAS CAIR States • 200km analysis • Trajectory / residence time • Other?

More Related