An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bridge Maintenance and Repair

  2. Preventative Maintenance Objectives • Preserve investment • - Cost of replacement higher than initial cost • - Repair costs increase with time • Safety and avoidance of catastrophic failure • Maximize life of bridge

  3. PREVENTATIVEMAINTENANCEISCOST EFFECTIVE!

  4. General Methods - Concrete • removal and replacement of deteriorated concrete • filling cracks • coating and sealing concrete surface

  5. General Methods - Steel • protect it from exposure to electrolytes • painting • galvanizing

  6. General Methods - Timber • control moisture content of the wood

  7. Bridge Seats and Caps • Runoff through deck joints contains debris and de-icing chemicals • de-icing chemicals that accumulate on substructure cap can result in: • corrosion of reinforcing steel and spalling concrete • corrosion of bearing assembly (i.e. “frozen bearing”)

  8. Bridge Seats and Caps (cont’d) • Proper maintenance • regular cleaning of substructure caps and deck joints with high pressure pump • provide drainage troughs below deck joints • surface protective coatings on bearing systems

  9. Substructure - Concerns • Material deterioration • wet/dry and freeze/thaw cycles • abrasion by water/ice at waterline • steel corrosion • concrete spalling • decay and vermin attack on timber • Ground settlement

  10. Substructure - Concerns (cont’d) • Impact damage • Other damage • pressure exerted on the piers and abutments by the earth

  11. Substructure - Maintenance • Material deterioration • protective coatings • preservatives • Foundation settlement and earth pressure • subsurface drains • struts • regrading soil profile

  12. Substructure - Maintenance (cont’d) • Impact damage • guard rails and energy dissipaters • fenders or steel plates on abutments and piers

  13. Superstructure - Concerns • Usually very difficult to access, so problems are frequently overlooked • Deterioration occurs with time • salt and chemicals - cracks in concrete • corrosion - frozen bearings • carbonation and sulfation • Impact damage • high loads • ice and drift

  14. Superstructure - Maintenance • Inspection • Good protection system • coatings - preservatives • sealers - patching • paints - crack filling • Pressure washing and cleaning • Strengthening

  15. Deck • Most susceptible to deterioration • de-icing salts, acid rain • ultraviolet rays • mechanical abrasion • Requires a lot of maintenance and repair • Protects rest of structure

  16. Concrete Decks • De-icing salt is main menace • causes reinforcement to corrode • concrete spalls • potholes

  17. Concrete Decks (cont’d) • Design and construction features to control deterioration • optimum cover for reinforcement • good drainage - silica fume • smaller skews - low w/c ratio • thicker slabs - good consolidation • air-entrained concrete - low shrinkage

  18. Concrete Decks (cont’d) • Main preventative maintenance goal is to control salt and moisture penetration • keep deck clean and drains operating properly • add drains in low spots • monitor deck for chloride contamination • fill cracks • asphalt sealing • polymer overlays • concrete sealers • bituminous concrete overlays with waterproof membrane

  19. Curbs & Railings • Deteriorate with time • cracking and spalling - corrosion • salt damage - collision • Replacement can be minimized • appropriate sealers, coatings and paint • galvanized steel

  20. Deck Drains • Can cause hazardous traffic situations • Can lead to deterioration of deck and other bridge elements and erode the soil backfill

  21. Deck Drains (cont’d) • Typical problems include: • ponding of water on bridge deck • poor drainage allows de-icing salts to deposit on deck and other bridge elements • plugged downspout will burst in freezing weather • Regular cleaning is best maintenance

  22. Approach Road • Approach bump • Guardrail • connection to bridge rail • transition stiffness (standard drawing S-1471 & S-1472) • Drainage • trough drains

  23. Approach Road (cont’d) • Erosion of headslopes and ditches • Signing • vertical clearance • load limit • delineators

  24. Streams and Channels • Erosion control • Slope protection • Bank protection • Rip-rap • Drift • Beaver dams

  25. Bridge Major Maintenance and Rehabilitation • Total deck replacement • Partial-depth deck replacement • Delamination repair • Deck overlays • Cathodic protection • Deck joint replacement • Bearing replacement

  26. Culvert Major Maintenance and Rehabilitation • Strutting • Culvert liners • Culvert end treatment repair and replacement • Cathodic protection

  27. Repair Materials • Concrete • silica-fume concrete • fibre reinforced concrete • latex modified concrete • corrosion-inhibiting concretes

  28. Repair Materials (cont’d) • Polymers • polymer concretes • polymer overlays • Specialty products • patching materials • grouts • sealers

  29. Approved Products • Standard testing procedures • Certified laboratories • Testing paid by manufacturer • Approved products list • concrete sealers • concrete patching & grouting • paints

  30. Concrete Sealers • Type 1a - relatively dry deck RMC < 55% • Type 1b - outdoor exposure deck RMC < 70% • Type 1c - outdoor exposure deck RMC < 80% • Type 2a - one component coating RMC < 70% • Type 2b -two component coating RMC < 70% • Type 3 - pigmented coating RMC < 70%

  31. Concrete Patching Materials • Type NH • poured horizontal patches, 3 day curing • Type OH-V • trowelled overhead or vertical patch • Type LTH • low temperature poured horizontal patch • Type HEH • high early strength poured horizontal patch

  32. Paints • Type B2 • Truss / River / Little experience • Type B3 • Girder / River / Much experience • Type B5 & B6 • Freeway / Overpass • Type 8 • Submerged pipe piles