1 / 7

Dee Calibration Apr 2007

4x5 SC array for the test beam in Apr 2007. Dee Calibration Apr 2007. VPT sorting by SC position. Old data Mean ~33 e/MeV now. SC region on Dee. Backplate angle as for beam from CMS I.P. =2.5. =1.57. TT26. TT19. Appropriate any five trigger mapping. DCC boundary. TCC boundary.

diamond
Télécharger la présentation

Dee Calibration Apr 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 4x5 SC arrayfor the test beamin Apr 2007 Dee Calibration Apr 2007 D Cockerill, 10 April 2006

  2. VPT sorting by SC position Old data Mean ~33 e/MeV now D Cockerill, 10 April 2006

  3. SC region on Dee Backplate angle as for beam from CMS I.P. =2.5 =1.57 TT26 TT19 D Cockerill, 10 April 2006

  4. Appropriate any five trigger mapping DCCboundary TCCboundary ‘Any 5’ trigger map D Cockerill, 10 April 2006

  5. Dee patch panel H4 control room Short fanout trunk cable MPO MPO Readout needed for 20 SCs 100 trigger GOH 20 data GOH Short fanouts on Dee FE – DCC 20 optical lines = 2 short fanouts (24 lines) FE – TCC 100 optical lines = 9 short fanouts (108 lines) MEM 24 optical lines = 2 short fanouts Totals 144 optical lines 13+1 = 14 short fanouts MPO trunk cables from Dee to H4 CR (barrel had MFS trunk cables at SM10 end) 2 trunk cables 2*96 = 192 lines +1 trunk cable for CCS/token rings/MEM D Cockerill, 10 April 2006

  6. Additional info D Cockerill, 10 April 2006

  7. Noise across Dee Transverse noise across Dee, VPTs sorted ET from 30 – 60 MeV (old normalisation) D Cockerill, 10 April 2006

More Related