An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LCA Project Delivery Team Management Meeting February 13, 2014 ; ; ; ;

  2. LCA PDT Project Status Report • Project Name: LCA Barataria Basin Barrier Shoreline (BBBS) PED • PMs:State – Brad Miller Corps – Steve Keen • Basin(s):Barataria • Related Projects – CIAP Caminada Headland Beach and Dune Restoration • Status (Schedule): • Scheduled Event(s)– • Chiefs Report: Signed 22Jun2012 • Design Agreement (DA): June 2014??? • Recent Event(s): • MVN is revising PMP and cost estimate to reflect reviewing the State’s design and construction of all beach and dune features as well as the design of @3.5 miles of marsh back-bay features. • NSE issues nearly resolved between USACE and State. • IDR submitted to MVD on 25Jul2013; approved by MVD on 08Sep2013. • Schedule Issue(s): NA

  3. LCA PDT Project Status Report • Project Name: LCA MR Hydrodynamic & Delta Management Feasibility Study • PMs: Corps– Daimia Jackson/PFs–Cherie Price CPRA – Elizabeth Jarrell/Carol Parsons Richards • Basin(s): Mississippi River, Barataria, Pontchartrain, Breton Sound • Status (Draft Schedule): • The Alternatives Milestone IPR – June 2014 • Tentatively Selected Plan – August 2015 • Agency Decision Milestone Meeting – March 2016 • Final Report Milestone September – 2016 • Chief’s Report – December 2016 • Recent Event(s): • Delta Mgmt Component: • Study is kicking off after rescoping and restructuring with CPRA • PDT reinitiation kick off meeting was held Tuesday, 11 Feb 2014 • Revising PMP and developing & evaluating an initial array of alternatives • CPRA Delft 3D & EwE revised SOW received. COE is reviewing ($3.5M) • Hydro Component: • Year 3 work plans under development • Presenting all efforts at the State of the Coast Conference on March 19th and 20th • Geomorphic Group finalizing the report • 1D finishing up years 1-2 production runs & working on HEC-RAS model development • 2D (ADH) calibration & validation complete, FWOP complete, team is beginning production runs • 3D (Delft 3D) calibration & validation complete, team is beginning FWOP runs • Other: • N/A

  4. LCA PDT Project Status Report Project Name: Small Diversion at Convent/Blind River PFs:State: Stephanie Zumo Corps: Danielle Tommaso PMs: State: Renee Bennett Corps: Steve Keen Basin(s): Lake Pontchartrain Related Projects: LCA Hope Canal Diversion, CWPPRA River Reintroduction into Maurepas Swamp, LCA Amite River Diversion Canal Spoil Bank, Gapping, CIAP Blind River Freshwater Diversion Status (Schedule): Next Milestones: PMP to CPRA done Data collection (borings, testing) on hold Design on hold Schedule & Budget Issues: All work on this project is suspended pending the resolution of the cross-crediting of WIK. PMP at CPRA for review/signature. Other: Review Plan approved December 2012.

  5. LCA PDT Project Status Report • Project Name: SW Coastal LA Feasibility Study (State/Corps) • PFs: State: Norwyn Johnson Corps: Andrew MacInnes • PMs: State: Norwyn Johnson Corps: PJ Varnado • Basin(s): Sabine, Calcasieu, and Mermentau • Related Projects: This feasibility effort has many State/CWPPRA/CIAP existing and proposed projects within the three parish study area. • Status (Schedule): • The TSP milestones were conducted on Oct 28 & Nov 1, 2013 • Public/Policy/Technical review completed on Jan 26, 2014 (receipt of comments extended) • Response to all comments • Agency Decision Milestone scheduled for Mar 5, 2014 • Schedule Issue(s): • CWRB/Final Report Milestone on Jul 10, 2014 • Signed Chief’s Report Milestone on Sep 30, 2014 • Additional evaluation of structural & nonstructural alternatives • Budget Issue(s): Not in President’s 2014 Budget (Corps has allocated funds to complete the study)