1 / 15

CHALLENGES IN DEVELOPMENT OF ERDMP

MAHARASHTRA NATURAL GAS LTD, PUNE. CHALLENGES IN DEVELOPMENT OF ERDMP. Sagar Varma Senior Manager( Fire & safety). 28.09.2012. MAHARASHTRA NATURAL GAS LTD. MAHARASHTRA NATURAL GAS LIMITED (MNGL) A Joint Venture promoted by GAIL (India) Limited ; and

dorie
Télécharger la présentation

CHALLENGES IN DEVELOPMENT OF ERDMP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAHARASHTRA NATURAL GAS LTD, PUNE CHALLENGES IN DEVELOPMENT OF ERDMP Sagar Varma Senior Manager( Fire & safety) 28.09.2012

  2. MAHARASHTRA NATURAL GAS LTD. • MAHARASHTRA NATURAL GAS LIMITED (MNGL) • A Joint Venture promoted by • GAIL (India) Limited; and • Bharat Petroleum Corporation Limited To implement City Gas Distribution Project in Pune, Pimpri-Chinchwad (including Hinjewadi, Talegaon & Chakan)

  3. BARUCH DAHEJ HAZIRA SURAT NAVSARI GAIL’S TRANSMISSION PIPELINES VALSAD VAPI SILVASA • DAHEJ – URAN PIPELINE • DABHOL – PANVEL PIPELINE • GHOTAWADE – CHINCHWAD PIPELINE DAHANU NASIK APTI BUDRUK SAFALE VASAI BORIVALI HAJIMALANGWADI TROMBAY PANVEL GHOTAW`ADE URAN IIL THAL CHINCHWADE AMBEWADI PUNE USAR DABHOL

  4. DFR prepared by MECON in 2002 MoP&NG allocated 0.4 MMSCMD APM Gas to Pune City in April’2004 Date of Incorporation - 13.01.2006 Date of Commencement of Business - 24.03.2006 Authorised by PNGRB on 15.04.2009

  5. 19 Bar Steel Network Mother Station Chinchwad City Gate Station DRS 4 Bar PE Network 100 mbar PE Network 21 mbar CU Network GI Installation Service Regulator Domestic Kitchen

  6. Customer Base Hotels/Small Commercial 13 commercial Domestic 4000 customers Vehicles 24000 auto 10000 cars 530 buses Industrial 37 nos.

  7. Major Challenge • CGD companies operate as utilities and operate in city conditions. • Our typical response to emergency is based on customer complaints.

  8. Major Challenge • Common regulation for midstream as well as downstream.

  9. Documentation challenge • Old ERDMP reformatted to include all the 30 points of regulation, 9 schedules and 7 checklists. • Supports in the form of annexure included to give sense to the content

  10. Documentation challenge To include • Risk analysis and consequence mapping. • Collection of data from various departments

  11. challenges • Site visit and mockdrills • Three mockdrills conducted in span to 2 hours. • resource constraints. • Offsite department involvement

  12. Other challenges • Perception of TPI delegates • Repeated Micro level changes

  13. contents Other Challenges • Flow of document • Longtime taken for each stage of accreditation Foreword Definitions Executive Summary 11 chapters ( covering each and every schedule) 20 Annexures 7 Checklists

  14. Benefits of the exercise • Involvement lead to knowledge up gradation • Various areas of safety management system come to surface • Comprehensive documentation • Knowledge sharing with other CGD • Tying of loose ends

More Related