An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Environmental, Safety, and Permitting ESP Members: Emily Eidam Kurt Meehleis Wendy Parker Katie Russell

  2. Working On… Compiling Permit Database Filing out forms Tabulating Costs Environmental Meeting with Robin Reich with HDR next week Contacted the Corp of Engineers Right of Way and Easement Issues

  3. Permits • SWPPP • Application for Letter of Non-Objection to Encroachment into Easement (E-W MOA) • Application for Letter of Non-Objection to Encroachment into Easement (N-S MOA) • Letter of Non-Objection for Encroachment into Easement (AWWU) • Letter of Non-Objection for Encroachment into Easement (ML&P) • Grading, Excavation and Fill Permits for Tract 3 • Grading, Excavation and Fill Permits for Tract 5 • Grading, Excavation and Fill Permits for Tract 7 • Agreement to Provide Access between MOA and DOT • Agreement to Provide Access between MOA and ARRC • Agreement to Provide Access between DOT and ARRC • Agreement to Provide Off-Street Parking (with MOA) • Alaska Coastal Management Program Coastal Project Questionnaire (CPQ) • AWWU Private System Application • ROW "Use" Permit (MOA) • ROW "Use" Permit (DOT) • Purchase/Lease/Permission Agreement with ARRC • Building Permit for the Main Building • Sign Permit • Fence Permit • Building Permit for the Bandstand • Categorical Exclusion OR Environmental Assessment OR Environmental Impact Statement • Safety Paperwork?

  4. Request from Groups:Data needed as of 3/4/08 Description of walkways Description of buildings Drainage patterns Drainage collection Drainage treatment Fill and excavation quantities-yd^3 Size of disturbed area (in acres) Anticipated discharges Two scaled site plans showing limits of fill/excavation with before and after contours and final drainage of the site Scaled cross sections showing existing and final grades, slope ratios, terracing width and height, erosion control measures, and setback distances from the property line

  5. Y:\CE438_2008\Phase 2\ROWcomposite.xlsx

  6. ROW – Things to Ponder DOT owns a 60’ wide right-of-way that encompasses the stairs and a 60’ wide right-of-way that encompasses the abandoned C St. Kurt had a one-on-one meeting with Allen Harding at DOT and was informed that DOT will most likely NOTvacate their right-of-way. If you have questions about ROW, talk to Kurt.

  7. In Conclusion….. • Questions • Have a nice Spring Break!!!!